1 / 8

Buffalo Niagara Wait Time Pilot Project Update

Buffalo Niagara Wait Time Pilot Project Update. TBWG April 2012 Ed Strocko Federal Highway Administration. Purpose . Test , Evaluate and Deploy Technologies to Automate the Measurement of Real-Time Border Wait Times at United States – Canada Land Border Crossings. Phase I.

snana
Télécharger la présentation

Buffalo Niagara Wait Time Pilot Project Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Buffalo Niagara Wait Time Pilot Project Update TBWG April 2012 Ed Strocko Federal Highway Administration

  2. Purpose • Test, Evaluate and Deploy Technologies to Automate the Measurement of Real-Time Border Wait Times at United States – Canada Land Border Crossings

  3. Phase I • Evaluated four solutions • GPS/Smartphone • Bluetooth • RADAR • Vehicle Waveform identification

  4. Phase 2 Elements • Deploy a system • Validate its performance • Put in place a long-term operational model Technologies • Bluetooth • GPS/Smartphone (dropped)

  5. Phase 2 Activities • Installation of a Bluetooth-based system at two US-Canada crossings in the Niagara region • Peace Bridge between Buffalo, NY and Ft. Erie, ON • Queenston-Lewiston Bridge between Queenston, ON and Lewiston, NY • Calibrate and verify the functionality and accuracy of the system and to support integration with existing traveler information systems. • Concept of operations will be developed that describes the operational model as applied in the Niagara region, and applicable to other international border crossings.

  6. Issues • Technological • Intermittent technical malfunction internal to some of the detectors • Need to lengthen readers from 1 hr. to 2 hr. queue • Misalignment of some readers • Operational • Funding • Maintenance • Reporting

  7. Recent Activities • Relocation of upstream readers to enable wait time detection up to 2 hours (January-February 2012). • Calibration of system with new readers positions (to be determined based on historical volume information-spring 2012). • Meeting with stakeholders (March 2012) • Ground-truth measurement and analysis supporting system acceptance following system calibration (measurement completed April 6th and analysis currently underway).

  8. Next Steps • Integration of agency systems with BWT system (spring 2012) • Concept of Operations (Spring 2012) • Investigate funding of instrumentation for Rainbow Crossing • Plan for transition to agency responsibility (Summer 2012) • Continued operation and monitoring of system until transition to agencies (through December 30, 2012)

More Related