An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. POCANTICO HILLS CENTRAL SCHOOL FACILITIES REVIEW COMMITTEE REPORT October 9, 2007

  2. Facilities Team • School Board Liaison • Mr. David Wilens • Committee Members • Rachel Gumina PTA President • John Conrad • Stephen Davey • Mark Fante • Patricia White • District Administration • Dr. Thomas C. Elliott, Superintendent/Principal • Mr. Jay Scotto-Friedman, Assistant Superintendent

  3. Consultant Team • Architect, SEI Design Group • Brian Cieslinski • Construction Manager, Savin • Joe Tola • Gail Perogine • Financial Advisor, Bernard P. Donegan • Charles Bastian

  4. Our Charge • To review the documents prepared by the architect and the work of the previous committee. • Make a recommendation of work scope that is critical to the success of the school for the next three to five years.

  5. Stepping Stones • 5 Year Capital Plan • Done in 2005 • Reviewed Infrastructure Work to be Addressed • Prior Facilities Review Committee • Reviewed capital items in 5yr plan • Discussed additional work to be reviewed • Made recommendations to the BOE

  6. Moving Forward • Reviewed all previous work • Discussed life cycle of infrastructure • Analyzed impacts of component parts • Addressed accessibility items and future planning to adapt • Determined health and safety risks • Defined a composite plan and recommendation

  7. POCANTICO HILLS CENTRAL SCHOOL RECOMMENDATIONS

  8. Recommendations $24,747 • General • Address sagging cubbies in the 1953 wing • Add fire separation from storage areas to the attic space

  9. Recommendations $178,797 • Windows/Doors • Restoration of leaded glass windows and doors • Add electronic release and cameras to the main entrance • Replace aging doors in the 1953 wing • Repair worn seals

  10. Recommendations $1,941,403 • Exterior Envelope • Slate roof repair • Gutter and downspout replacement • Replace roofing material on 1953 and 1971 building structure

  11. Recommendations $388,528 • Accessibility • Install an elevator in the 1953 wing to gain access to the first and second floors • Add a stair lift to the 1971 corridor • Provide accessibility for the nurses office and toilet room within • Generate long term plan for full adaptation of the facility

  12. Recommendations $3,352,601 • Program • Library space utilization, technology, windows, and climate control • Shop area reconfigured to increase utilization • Home Economics area reconfigured to increase utilization • Auditorium enhancements • Gymnasium floor, bleachers, lockers, and skylights • Expand guidance area & middle school special education classroom

  13. Recommendations $3,287,640 • Mechanical Items • Replace heating systems for the entire building • Replace and update ventilation per new code • Add air conditioning to center core spaces, including the library, cafeteria, and Auditorium. • Provide DDC control system for entire building

  14. Recommendations $539,485 • Electrical/Communications • Replace outdated service panels and distribution boards • Replace emergency generator • Update emergency lighting system per code • Replace the public address system

  15. Recommendations $210,350 • Fire Protection • Install a dry-type sprinkler system in the attic space • Provide lightning protection on the upper roof section of the building

  16. Recommendations $259,844 • Plumbing & Environmental • Pipe insulation on water lines • Asbestos Abatement on HVAC systems

  17. Recommendations $4,208,605 • Sitework • Pool and pool pump room replacement

  18. Budget Construction Budget $14,391,999 Incidental Budget $ 3,598,000 Project Total $17,989,999 $18,000,000

  19. Capital Allocation

  20. POCANTICO HILLS CENTRAL SCHOOL SCHEDULE

  21. Proposed Schedule

  22. POCANTICO HILLS CENTRAL SCHOOL PRELIMINARY FINANCIAL ANALYSIS

  23. Questions? Facilities Review Committee Report