40 likes | 231 Vues
EGSE. Otto H. Bauer MPE. Herschel Common Science System for ILT. Consists of HCSS v0.1 and EGSE set-up Based on a staggered development HCSS is a common development of HSCDT and ICC´s HCSS v0.1 PDR successfully completed (end Feb.) EGSE is a common development of instrument teams
E N D
EGSE Otto H. Bauer MPE EGSE
Herschel Common Science System for ILT • Consists of HCSS v0.1 and EGSE set-up • Based on a staggered development • HCSS is a common development of HSCDT and ICC´s • HCSS v0.1 PDR successfully completed (end Feb.) • EGSE is a common development of instrument teams • Organized through EGSE Working Group • Work packages defined in Statements of Work • Commitment through Letter of Understanding • Based on re-use and adaptation of available packets (SCOS 2000, Integral MIB Editor, Test Control • Supported by Project (ESTEC, ESOC) EGSE
Distribution of Work Packages • CDMS (1553B + Tranfer Layer Protocol) SPIRE • Test Equipment Interface (TEI) HIFI • TM/TC Interface HIFI • SCOS 2000 all • On-board S/W Maintenance Facility IFSI • MIB Editor evaluation (-> Integral) HIFI • Test Control PACS • SCOS 2000 On-board S/W Management PACS EGSE
Deliveries and Schedule Status Date Supplier Customer Delivered Item • Feb 5 ESTEC HIFI SCOS 2000/Router ICD • Feb 15 HIFI all Router prototype • Feb 27 ESOC all MIB Editor prototype • Feb 28 ESTEC HIFI, PACS SCOS 2000 v2.0 EGSE extension including TOPE • Mar 1 HIFI all Router (SCOS 2000 – TEI) • Mar 1 ESOC all MIB Editor • Apr 15 PACS all Test Control (IFSI DPU test) • May 8 SPIRE all CDMS Simulator • May 18 Everything is at MPE Integration for IFSI tests • May 31 Shipment to IFSI • June 30 ESTEC all SCOS v2.1e (Sol. 8, dif. COTS) • Oct 1 PACS all OBSM (SCOS 2000) • Oct 1 HSCDT all HCSS v0.1 (first release) • Oct 1 Everything is at MPE Integration (HCSDT + ICC´s) EGSE