1 / 21

The Old

The Old. 25 SEPTEMBER 2008. Presented by Kevin Whiteway Managing Director Rift Valley Railways. The Kenyan and Ugandan Railway Network. Rail Profile – Mombasa to Kampala. `. Timboroa – 2844m (9352 Ft). Concession Details. KRC URC

sophie
Télécharger la présentation

The Old

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Old Rift Valley Railways

  2. 25 SEPTEMBER 2008 Presented by Kevin Whiteway Managing Director Rift Valley Railways

  3. TheKenyanandUgandanRailwayNetwork

  4. Rail Profile – Mombasa to Kampala ` Timboroa – 2844m (9352 Ft)

  5. Concession Details KRC URC Total length of rail network – Km’s 2,210 431 Part of Network to Concessioned 1,920 241 Freight volumes moved have been in decline since 2003 Number of - Wagons 3,800 - Mainline Locomotives 33 Other Locomotives 53 - Employees 2,600 580

  6. THE LAST 20 MONTHS • Poor Business Planning on entry • Under-estimated condition of track and rolling stock • Poor administrative planning and procedures • Insufficient working operational cash • Capital programme not sufficiently targeted • RESULT - UNDER ACHIEVED Rift Valley Railways

  7. Where to Rift Valley Railways

  8. Challenges • Management and organizational structure review required • Long lead times to buy rail, spares and rolling stock • Meeting market expectations in short term • Track unstable and poorly maintained • Locomotive reliability poor • Wagon defects and “fitness for purpose” • Accidents and derailments • Sabotage and vandalism of rail infrastructure • Technical skills of staff in all Departments • Upgrade of workshops

  9. LIGHT AT THE END OF THE TUNNEL Rift Valley Railways

  10. 5 Year Investment Plan Rift Valley Railways

  11. Rift Valley Railways

  12. INNOVATIONS • Better forward planning • Better use and turn around of assets • Introduction of longer trains • Better use of train paths • Keeping operational and safety advices current • Health, Safety and Environment Programmes • Skills upgrading of all personnel • Rosters that reflect the needs of the business • Improved incident response Rift Valley Railways

  13. Infrastructure • Culverts in Uganda • Bridge inspections and maintenance • Rail-over-road bridges • Floods and wash-away • Level crossings problems and signage • Rail Maintenance Plant and Equipment • Tunnels • Sleeper press and production Rift Valley Railways

  14. PLANNED MAINTENANCE AND UPKEEP OF EXISTING ASSETS Rift Valley Railways

  15. HELP REQUIRED • Comply with agreed weight limitations • Simplification of customs and revenue procedures • Simplification of transit cargo procedures • Pre advice that transit cargo is to travel on rail • Cross border issues resolved - It is one railway • Stopping the theft along the rail line • Bureaucracy in all areas of enterprise to be streamlined • Theft and encroachment on rail property Rift Valley Railways

  16. Rift Valley Railways

  17. OUR COMMITMENT • RELIABILITY • MORE AND LONGER TRAINS TO FULLY UTILISE AVAILABLE TRAIN PATHS • LESS BREAKDOWNS • LESS DERAILMENTS • REALISTIC PRICING • SECURITY OF CARGO • GOAL WITHIN 5 YEARS 40% OF IMPORT CONTAINERS Rift Valley Railways

  18. We have the resources Rift Valley Railways

  19. Rift Valley Railways

More Related