100 likes | 202 Vues
This document presents a comprehensive overview of the building's structure as of August 30, 2012. It includes front, back, and side views, highlighting the entrance and detailing the various levels from the basement to the second floor. Notably, construction work is ongoing on the third floor, emphasizing the building's development progress. This visual and structural documentation serves as a valuable reference for understanding the architectural design and ongoing construction efforts of the facility.
E N D