An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering Practices Working GroupAccomplishments & Plans John H. Gertsen BWXT Y-12, L.L.C. June 7, 2005

  2. Engineering Practices Working Group • Nearing 2 years in existence • Working Group is growing – membership is up • Sub-groups are being re-energized • Significant interest of members continues • As WG matures, ad hoc use of member pool as a resource is increasing

  3. Engineering Practices Working Group • Membership • 106 members (33 in WG, 63 in sub-groups) • 31 DOE contractors • Five DOE sponsors of WG or sub-groups (includes OECM, EM, EH, and NNSA)

  4. Structure / Leadership • Engineering Practices Working Group Chair John Gertsen BWXT Y-12 Vice Chair Dave Lowe Kaiser-Hill (RFETS) Secretary Tobin Oruch Los Alamos National Lab (UC) • Fire Protection Sub Group Chair Richard Lewis Westinghouse Savannah River • Configuration Management Sub Group Chair Tom Reed BWXT Y-12 • Engineering Standards Sub Group Chair Stan Palmer Idaho National Laboratory (BEA) • Value Management Sub Group Chair Richard Harrington CH2M Hill Hanford

  5. Accomplishments (12 mos.) - EPWOG • Design Adequacy of Safety SSC’s (Backfit) – published recommendation – topic of significant DNFSB interest • Design Basis Threat – conducted review of engineering approaches • Third Party Financed Facilities – conducted informational telecon • Value Management Initiative – organized and chartered sub-group on this topic, based on member and board interest • Engineering Procedure Sets – voluntarily shared among members • Excavation/Penetration Permitting – completed survey of site practices • Drawing Management – completed survey of practices, and shared 3-D model practices – more work to do • HEPA Filter Testing (in cooperation with ISMWG) – completed initial effort on need for and availability of independent testing capabilities – more work to do

  6. Accomplishments – Fire Protection Sub-Group • Implementation of Reliability Centered Maintenance for Fire Systems • Benchmarking of Fire Protection Resources and costs across the DOE Complex • Developed a list of NFPA technical committee members amongst EFCOG • Developed consensus comments to Draft DOE Order 420.1B • Conducted four teleconferences and one meeting

  7. Accomplishments – Configuration Management SG • Clarified purpose of Sub-Group • Updated and expanded roster • Selected new Chair • CM during Transition, Deactivation, Decontamination, and Demolition – Draft guide published • Held meeting in Spring 05 • Well attended, including over 5 DOE employees • Facilitated Value Management session held as part of meeting

  8. Accomplishments – Engineering Standards SG • Subgroup in transition after formation of EPWOG • Membership poll conducted • EPWOG endorsed continuation of Sub-Group • New Chair selected

  9. Accomplishments – Value Management Sub-Group • Interest confirmed • Members solicited • Charter written • Chair and sponsor selected • Organizational meeting held (including integration with 6 sigma tools) • First meeting held – in conjunction with CM Sub-Group • Value Management study conducted in conjunction with meeting

  10. Ongoing Initiatives - EPWOG • Design adequacy of existing safety systems – SME Mentoring and follow-up to SAWG and DNFSB comments • HEPA-filter testing within DOE – standards/acceptance criteria (with ISMWG) • Criteria for engineering involvement with maintenance • Engineering for Non-Nuclear work – combining with above, and Value Management session is probable in Fall 05 • Best practicesin engineering • Drawing Management

  11. Ongoing Initiatives - EPWOG Sub-Groups • Fire Protection Sub-Group • Active involvement at DOE Fire Safety Workshop & NFPA Conference • Configuration Management Sub-Group • As-built documentation • Document Control and Records Retention • Scope of CM Application (graded approach) • Engineering Standards Sub-Group • DOE contract for online national standards • Refocus Sub-Group direction • Value Management Sub-Group • VM as a tool within EFCOG

  12. Potential Future Initiatives • Exploring possible engineering training event (modeled after SAWG) in 1-2 years • Maintaining list of potential initiatives, including: • DNFSB Recommendation 2004-2, Active Confinement Ventilation ( in conjunction with SAWG) • D&D technology • Cost drivers for engineering • Human Factors Engineering • Common item—approved vendors list

  13. Lessons/Challenges/Effectiveness • Increased communication among members • Diversity of members in how Engineering is organized and executed at individual member companies • Use of Value Management on Engineering Processes