An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Culvert Asset Management2013-14 Asset Management Steering Committee January 30, 2014

  2. Outline – Today’s Presentation • Region Visits • Schedule • Outline of Presentation to Regions • HMT Culvert Inventory Project Status • Budget • Milestones • Accomplishments • Next Steps • Future Tasks & Data Maintenance

  3. Regions VisitsSchedule • Region 3 = February 5th • Region 1 = February 11th • Region 2 = February 18th • Region 4 = February 25th • Region 5 = February 26th • Others • Region 5 – NEACT (TBD) • As requested

  4. Presentations to Regions Outline • Goals • Steering Committee • Budget • Business Model • Project Milestones • Accomplishments • Culvert Data – What, Where, How • Culvert Repair Funding Sources • Future Tasks / Efforts • Questions

  5. HMT Culvert Inventory Project • Team Members • Budget • Milestones • Accomplishments • Next Steps

  6. Budget • 2011-2013 • Budgeted Amount: $2,034,017 • Actual Spent to Date: $1,025,227 • 2013-2015 • Federalized STIP funds $1.2m Total Project Budget is $2 million

  7. Culvert Inventory Target Milestones Note: No significant field work during winter months (Nov 2013 – March 2014)

  8. Accomplishments • Hwy and MP’s Completed • Dark Blue = 2013 New Inventory • Green = 2007-09 Inventory = Aged Data • “Grate Stick”

  9. 2014 Field Season - Next Steps • Recruit / Staff Field Crews • Interviews in February • Culvert Inventory Training • 1st 2 weeks in April • 2014 Hwy & MP locations. • Light Blue = New Inventory • Green = Aged Data Update

  10. Future Tasks & Data Maintenance2015 and beyond . . . . . • Additional / Completion of Inventory? • Culvert Inventory Training • DFMS Training • Data Maintenance?

  11. Future Inventory Efforts • Map • Show everything inventoried through 2014.

  12. Future Inventory Efforts - Training • Culvert Inventory Training • Module 1: Safety + Basic Computer Use • Module 2: Basic GPS / GeoXT • Module 3: Culvert Inspection (Office) • Module 4: Culvert Inspection (Field) • Inventory Specialist Certification

  13. Future Inventory Efforts • Business Models • Always collaborate with Geo-Env • Management • Staffing • Recommended Model • GE Managed • Rotational Staff from local area • Other Staffing Models • Consultants, LD’s, Temps.

  14. Future Inventory Efforts – Equipment • GPS Unit:Trimble GeoXT or XH with the current application, GPS antenna with Range Pole & Bracket, GPS Software MS ActiveSync. • Measuring Tools:TruPuls 360 Bluetooth Laser Range Finder, 25' dual Engineering / Inches Tape, Survey Rod and Hand Level, Calculator. • Vehicle:with a DMI. • Hand Tools:  Geologist's Hammer, Embankment Probe, Square & Round head Shovels, Machete, Bi-Pass Pruner, Brush King, Brush Axe, Grate Stick, Grate Puller. • Digital Camera: Water Proof and two Memory Cards (2 GB minimum each). • LED Flash or Flood light: (min 3000 lumens), spare batteries and a vehicle charger. • Traffic Safety Equipment:  Minimum of two Warning Signs, two Sign Standards, and four 28" cones (non-interstate use). • Marking Devices:  White spray paint, wood construction lath, bright construction ribbon, white dry erase board with dark colored markers, black sharpie permanent markers.

  15. $2,050,000 to complete inventory statewide • Maintain Current (31%) Culvert Data • $300,000 / year (10 crew-months/year) • Maintain All (100%) Culvert Data • $800,000 / year (32 crew-months/year) New Data Data Maintenance

  16. Questions? Contacts: Culvert Conditions: Robert Trevis, PE 503-986-3860 Culvert Funding: Wade Holaday, PE 503-986-3365 Manager: Paul R. Wirfs, PE 503-986-3526 Project Manager: Chris Fiore, Consultant 503-986-3310