1 / 7

VOS data com. systems

VOS data com. systems. Manned VOS. AWS systems. PMO-3 workshop – Hamburg – 23-24 March 2006. Inmarsat-C (standard). Only manned VOS are concerned here. • Advantages. GMDSS beacon of the ship is used (by almost manned VOS)

Télécharger la présentation

VOS data com. systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VOS data com. systems Manned VOS AWS systems PMO-3 workshop – Hamburg – 23-24 March 2006

  2. Inmarsat-C (standard) Only manned VOS are concerned here • Advantages • GMDSS beacon of the ship is used (by almost manned VOS) • alphanumeric FM-13 SHIP messages reported from the ship (no processing needed ashore – important aspect for code 41) • Drawbacks • hight cost of transmission (1.00 €/report) • unfair share of the transmission costs (code 41) : a few NMSs pay communication costs for VOS recruited by others Remark : Some NMSs ask for a direct reception of the SHIP reports of their VOS fleetsThe « code 41 » procedure is then not used but communication costs remain high PMO-3 workshop – Hamburg – 23-24 March 2006

  3. Inmarsat-C (standard) Only manned VOS are concerned here • Existence of bilateral arrangements • e.g. between DWD and Met Office ; DWD and KNMI • allow to reimburse communication costs (e.g. for German VOS) • E-SURFMAR compensations • 54 k€ in 2005, 59 k€ in 2006 • about 300,000 reports compensated in 2005 ; 315,000 in 2006 • about 0.18 €/report – to be compared to the real cost (~1.00 €/report) PMO-3 workshop – Hamburg – 23-24 March 2006

  4. Inmarsat-C (standard) PMO-3 workshop – Hamburg – 23-24 March 2006

  5. Alternative com. systems • For AWS • any system may be used since the AWS is fitted with its own transmitter • e.g. Argos, Globalstar, Inmarsat (Data Reporting), Iridium, Meteosat • For manned VOS using Turbowin for instance • - it seems difficult to report pure binary data through the GMDSS beacon • but it should be possible to report half-compressed data through this way (~0.40 €/report) • or to fit Turbowin laptops with an Iridium modem + antenna (0.08 €/report) Equipment (300-500€ laptop excluded) to be amortized • or to use the cheapest system used aboard by the crew to report ashore: (Globalstar, Iridium…) Remark : In any case, « code 41 » would be abandonnedbecause of the necessity to have data processing centres PMO-3 workshop – Hamburg – 23-24 March 2006

  6. Binary compression Not linked reserved to Batos or Inmarsat only • Characteristics • a SHIP report tits in a 256-bits block (32 bytes) • rather looks like to an Argos compression than BUFR or compressions commonly used by computers • data received through e-mails • Advantages • reduces the communication costs (0.15 €/report for Inmarsat, 0.08 €/report for Iridium) • Drawbacks • needs a data processing centre to uncompress the data and then code them into GTS formats • to simplify the work, a ship is attached to a processing centre => data stream control possible = advantage PMO-3 workshop – Hamburg – 23-24 March 2006

  7. Binary compression Each ship is attachedto a processing centre Monitoring and Metadat PMO-3 workshop – Hamburg – 23-24 March 2006

More Related