1 / 17

Civil-Military Workshop Harmonised Data Sharing

Civil-Military Workshop Harmonised Data Sharing. Giuseppe Acampora EUROCONTROL DNM/COO/NOM/OPL/PRO. TOPICS. Data. Data Flows. Notification. Real time. INPUT/OUTPUT PHASE 1. AAs. AMCs. FMPs. NM. Airspace data. Other data. ASM areas* NO ASM areas CDRs Sectors Route Net. RAD

swann
Télécharger la présentation

Civil-Military Workshop Harmonised Data Sharing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Civil-Military WorkshopHarmonisedData Sharing Giuseppe Acampora EUROCONTROL DNM/COO/NOM/OPL/PRO

  2. TOPICS Data Data Flows Notification Real time

  3. INPUT/OUTPUT PHASE 1 AAs AMCs FMPs NM Airspace data Other data • ASM areas* • NO ASM areas • CDRs • Sectors • Route Net. • RAD • Regulations • NOTAMs • MET • Traffic data • Areas requests • CDRs requests • LoAs • Sector capacity • Sector Load Flow measures Areas All./Act. CDRs Avai./Use MIL GA AOs TSA/TRA, R&D AMC Manageable, CBA, RCA, PCA (previous co-or. Area) ASM/ATFCM PROCESS

  4. INPUT/OUTPUT Phase 2 AAs AMCs FMPs CFMU Airspace data Other data • ASM areas* • NO ASM areas • CDRs • Sectors • Route Net. • RAD • Regulations • ASM areas* • NO ASM areas • CDRs • Sectors • Route Net. • RAD • Regulations • X NOTAMs • Airport inf. • Airport capacity • RWY in use • SID/STAR in use • Airp. Slot time • TWY time ASM/ATFCM PROCESS • MET • Traffic data • Sector capacity • Sector Load • Areas requests • CDRs requests • LoAs • Areas Usage • MET • Traffic data • Sector capacity • Sector Load • Areas requests • CDRs requests • LoAs Flow Measures Sector in. Flow Measures Areas All./Act. CDRs Avai./Use MIL GA AOs TSA/TRA, R&D AMC Manageable, CBA, RCA, PCA (previous co-or. Area)

  5. ADR ASM/ATFCM data eAMI eRAD Level 1 EAUP/EUUP ASM Data Flows – Phase 1 ASM Tools Draft/ National AUP/UUP CIAM Data User

  6. ADR ASM Level 2/3 data ASM/ATFCM data ASM data archive Post OPS ASM Data Flows – Phase 2 ASM Tools Draft/ National AUP/UUP • eAMI • eRAD • Level 1 EAUP/EUUP CIAM AS Activations /de-activations ATS Systems Data User AS Activations /de-activations

  7. Rolling Process Scenario - Notification Notification RRP FLS IFPS AOLO NOP Portal B2B B2C Lead Time?

  8. Rolling UUP – March vs August 2012

  9. e-AMI B2B service – June 2012

  10. E-AMI B2B – Major Users

  11. E-AMI B2B – Major Users

  12. Not Using CIAM Allocated in CIAM Not allocated in CIAM RSA Publication in CIAM

  13. NM ID RESTRICTIONS Direct Impact on AUP/UUP Procedures • Country Code Restrictions: This restriction ID type will be proposed to identify RSA allocations, published via daily AUP/UUP. The RSA’s must be implemented in CACD. • Example: EBTRA01, EGD701 • All FPL’s (including DCT filing) through the EBTRA01, EGD701 will become invalid. • This restriction (Dependant Applicability) will only work when: • - The RSA is created in CACD • - The Restriction is created in CACD with RL the required RSA (TRA01,D701) • - The RSA is allocated via CIAM ( with time and level)

  14. Real Time Data Background Benefits Validation Process

  15. Background OCG/9: an investigation activity to be launched Ad Hoc Task Force O (1st March 2010) 8th Task Force O (13th April 2010) ADR Workshop (22nd March 2010)

  16. Awareness To be validated Airspace usage Safety Benefits Post OPS ATFM measures

More Related