1 / 34

Leveraging GIS for Effective Groundwater Monitoring in a Cost Constrained Environment

Leveraging GIS for Effective Groundwater Monitoring in a Cost Constrained Environment. Joshua Cimera 1 ; John Mansfield 1 ; Dale Prewett 1 ; Peter King 1 ; Carl Walters 2 Goulburn Murray Water 1 ; Goulburn Broken CMA 2. Partnership Acknowledgment.

tadhg
Télécharger la présentation

Leveraging GIS for Effective Groundwater Monitoring in a Cost Constrained Environment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Leveraging GIS for Effective Groundwater Monitoring in a Cost Constrained Environment Joshua Cimera1; John Mansfield1; Dale Prewett1; Peter King1; Carl Walters2 Goulburn Murray Water1; Goulburn Broken CMA2

  2. Partnership Acknowledgment This project is funded as part of the Goulburn Broken Catchment Management Authority Regional Catchment Strategy in the Shepparton Irrigation Region and is provided with support and funding from the Australian Government and Victorian Government. This project is delivered primarily through partnerships between the Department of Environment and Primary Industries, Goulburn-Murray Water, the Goulburn Broken Catchment Management Authority and other bodies.

  3. Presentation Outline • Background • Previous Approach • New Approach • Indicative Cost Savings • Role of GIS • Future Work

  4. Background • Groundwater Monitoring Program jointly funded • Goulburn Broken CMA (50%) • Goulburn Murray Water (50%) • Funding constraints have required the program to be reviewed

  5. Previous Approach • Identified Problems: • the purpose for which the data was collected was not clear; • a lot of data was being collected for the “common good” without contribution from other beneficiaries; • due to the number of bores, maintenance was being neglected.

  6. New Approach • Identified that there were four purposes for which data was required • Identified it was feasible to have only one program with four sub-programs aligned with each purpose. • The four purposes/subprograms: • Environmental • Public Pump Operation • Adaptive Management • Watertable Mapping

  7. Why are we even monitoring groundwater?

  8. Public Pump Operation

  9. Role of GIS • Desktop Assessment • Field Verification • Mobile Mapping

  10. Desktop Bore Assessment • GIS used to collate existing information and assign to each monitoring bore • Depth, screen intervals, etc • Monitoring history – reliable data source? • Ability to interrogate bore info with other datasets • Roads • Public or private land • GMW assets (ie Salinity Control Pumps) • Environmental Assets

  11. Field Verification • ArcGIS for Windows Mobile deployed on a GPS enabled Motion Tablet • Drop down menus for standardised responses • Allowance for some general comments that aren’t covered by drop down answers • Bore locations able to be updated in the field by operator • Enables disconnected data editing

  12. Bore Assessment

  13. Mobile Mapping

  14. Update coordinates

  15. Menu

  16. Drop Down Menus

  17. Drop Down Menus

  18. Date Entry

  19. Date Entry

  20. Waterlevel Entry

  21. Waterlevel Entry

  22. Data Sync to Corporate Spatial Database

  23. Data Sync to Corporate Spatial Database 3G Network Public Pump Operation Deployed Tablets Watertable Maps Corporate Spatial Database

  24. Indicative Cost Savings Saving of $6,000 per month

  25. Next Steps • Finalise the monitoring program based on field assessments • Fully integrate the monitoring program with GMW’s asset management system, Maximo • Add track feature to record the ‘way-in’ to difficult to find bores • Automate some of the manual transfer of data between GMW corporate systems • Upgrading of key monitoring bores

  26. Questions?? After Before

More Related