An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HYDRO-ELECTRIC Forward Thinking

  2. ProductOverview West Lafayette Wastewater Treatment Facility

  3. ProductOverview Meter & Electrical Equipment Meter & Electrical Equipment 8 million gallons/day 8MGD ~ 5,600gal/min 5ft Power -> 2kWh

  4. MarketAnalysis • 15% of their total budget spent on energy costs (Oregon ACWA, 2008). Energy is their biggest operational expense! • The energy captured in sewage systems is ~10 times the energy needed to treat it (WERF, 2005)

  5. ElectricityPricing • Current Electricity costs • Indiana ~$.08 per kWh • New York ~$.14 per kWh • California ~$.15 per kWh $ 0.16/hour $0.28/hour $ .30 /hour Savings Per Unit/Hour

  6. HYDRO-ELECTRIC Forward Thinking