1 / 75

The Erosion Control Inspection

The Erosion Control Inspection. So, You Have to Do an Erosion Control Inspection. Who’s protecting these inlets!!. What’s a wattle and where did the contractor put them?. The Basics of an Inspection. Why you have to do an inspection When you have to do an inspection

tamah
Télécharger la présentation

The Erosion Control Inspection

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Erosion Control Inspection

  2. So, You Have to Do an Erosion Control Inspection. Who’s protecting these inlets!! What’s a wattle and where did the contractor put them?

  3. The Basics of an Inspection Why you have to do an inspection When you have to do an inspection How you do an inspection

  4. The Basics of Why You Have to Do an Inspection Required by Trans 401.10 Determines if the BMP’s have been properly implemented, installed and maintained Identifies corrective action that is needed

  5. The Basics of When You Have to Do an Inspection Once per week Within 24 hours after every precipitation event of ½” or more during a 24-hour period At the beginning and end of each stage After installation of BMP’s At the completion of the project

  6. The Basics of How to Do an Inspection The prime contractor should be invited to accompany the inspector when doing inspections The invite must be sent at least 1-hour in advance of the inspection Use forms WS1072 and WS1074 from pantry software to complete the inspections

  7. The Paperwork

  8. Form WS1072 Erosion control diary/inspection form Pantry software You all should have one

  9. Form WS1074 Erosion control order form Pantry software Used if corrections or changes are needed Prime contractor is not required to make changes unless an order is sent You all should have one

  10. What Do You Do With All This Paperwork Keep all inspections and orders in the field office, with the ECIP, in a binder This needs to be available to the public

  11. In the Field

  12. Typical Best Management Practices(BMP’s) Silt Fence Ditch Checks Erosion Mat Mulch Inlet Protection Turbidity Barrier Grading Practices

  13. Silt Fence SDD 8e9-6 Needs to be entrenched Joints should be twisted or overlapped Post spacing, 3’ max or 8’ max if using woven geotextile fabric Fabric should face the flow Should go up and over a culvert

  14. Ditch Checks, Types Erosion Bales Straw Wattles

  15. Ditch Checks, Types Silt Dikes Bio-Logs

  16. Ditch Checks, Types Rock Bags

  17. Ditch Checks SDD 8e8-3 Entrenched, 4” for erosion bales and 2” for all other types Minimum of 10” height above the flow line Erosion bales should be double row

  18. Erosion Mat, Types

  19. Erosion Mat, Types Erosion Mat Class I Type B

  20. Erosion Mat, Types Erosion Mat Class II Type B

  21. Erosion Mat, Types Erosion Mat Class III Type B

  22. Erosion Mat Should not be stretched Should be laying flat on the soil Properly overlapped and shingled Properly anchored Must be entrenched on the leading edge

  23. Erosion Mat

  24. Erosion Mat Shingling

  25. Mulch • Three methods available for installation • Netting • Tackifier • Crimping

  26. Mulch, Netting Method Uniform depth of ½” to 1-1/2” Anchored with netting or twine secured to pegs or staples Begin at top of slope and proceed downwards

  27. Mulch, Tackifiers Spread by machine to uniform ½” to 1” depth ½ to 3 tons per acre A spray on non-asphaltic tack anchors the mulch

  28. Mulch, Crimping Uniform depth of ½” to 1-1/2” Anchored with a mulch tiller designed to crimp mulch into the soil Crimped a minimum of 1-1/2” and a different anchor method must be used if 1-1/2” is not possible

  29. Inlet Protection SDD 8e10-2 Four types, A,B,C,D

  30. Inlet Protection Type A Type b

  31. Inlet Protection Type C Type D

  32. Turbidity Barrier SDD 8e11-2 Should be 2’ higher than Q2 elevation or estimated high water elevation, whichever is greater Should be anchored with sandbags Post spacing 10’ max

  33. Grading Practices Leave existing vegetation in place as long as possible Limit exposed areas Topsoil and restore areas as soon as grading is completed Staging

  34. Let’s Do an Inspection

  35. Silt Fence

  36. Silt Fence

  37. Silt Fence

  38. Ditch Checks

  39. Ditch Checks

  40. Ditch Checks

  41. Erosion Mat

  42. Erosion Mat

  43. Mulch

  44. Inlet Protection

More Related