1 / 26

FESA 3 Implementation Status

FESA 3 Implementation Status. Stephane Deghaye BE/CO On behalf of the FESA team and many users. Agenda. FESA 3 Roadmap for 2013 and 2014 FESA 3 Adoption in BE FESA 3 Adoption in EN FESA 3 Adoption in TE Other groups Conclusions. FESA 3 Road Map – ‘13.

tamyra
Télécharger la présentation

FESA 3 Implementation Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FESA 3 Implementation Status Stephane Deghaye BE/CO On behalf of the FESA team and many users

  2. Agenda • FESA 3 Roadmap for 2013 and 2014 • FESA 3 Adoption in BE • FESA 3 Adoption in EN • FESA 3 Adoption in TE • Other groups • Conclusions

  3. FESA 3 Road Map – ‘13 • FESA 3 follows ACCOR milestones • Development baseline milestone – 1st of July 2013 • Operational baseline milestone – 1st of Dec. 2013 • FESA 3 for early adopters was available early 2013 • FESA 3.1 was released according to the ACCOR planning on the 1st of July. • Since then, many improvements and fixes released (3.1.1.0, 3.1.1.1 and 3.1.1.2).

  4. FESA 3 Road Map – ‘13 • The ACCOR Operational baseline is FESA 3.1 • FESA 3.1.2 will be released in Dec 2013 • Reminder: minor version • Bug fixes • New features • Backward compatible

  5. FESA 3 Road Map – ‘14 • Next minor version will be in spring ‘14 (1.3) • Next major version will be FESA 3.2 with RDA3. • FESA 3.2 estimated release date: June ‘14 • for the SPS dry runs. • FESA 3.1 and FESA 3.2 are fully compatible (except RDA)

  6. FESA 3 Adoption

  7. FESA in A&T Sector • Many groups (12) in the A&T sector rely on FESA for their FEC software developments • Also a few users outside the sector (PH, DGS) • About 100 persons are registered FESA developers  Training for the new comers

  8. FESA 3 Support & Training • Since April ‘13, 2 courses on FESA 3 available • FESA Basics (2 days): should be mandatory for any new developer • FESA Advanced and Migration (1 day) • Support team (fesa-support@cern.ch) to help with: • Migration • New design • Problem with or in the framework • Try to solve in your team the C++ problems

  9. FESA 3 Adoption in BE

  10. BE/ABP HSL • Linac 2 source migrated in FESA3 (99%) • Linac4 source. FESA2 – low prio after Linac 2 start-up SU • See EN/ICE/PLC • New development in FESA3 (lab only – 2014) LCU • See EN/STI/ECE • New development in collaboration with BI in FESA3

  11. BE/BI • 99% of the classes (100+) are FESA 2 • FESA 3 is mainly under test & validation • A few classes under migration (PSB BCTs, SPS Orbit, PSB/LN4 BLMs) • All new developments based on FESA 3 from now on • Plan: migrate quietly aiming at a complete renovation by end 2015 – FESA 2 end-of-life.

  12. BE-CO-FE Generic classes • 90% migrated to FESA 3 • New developments in FESA 3 • Operation: Restart with FESA 3 everywhere* OASIS • New developments in OASIS  FESA3 • Migration will start in 2014 *except LynxOS FECs

  13. BE-CO-HT (Timing) • All GM classes migrated to FESA 3 • LTIM available in FESA 3 (32 and 64-bit) • LHC Central timing in FESA 2 (redesign in 2014)  evaluate migration to FESA 3 • FESA 3 in operation for • central timing of LIC, Linac4 and CTF. • LTIM: many installations (e.g. PSB BCT, CPS RF, FECs for Mil1553…).

  14. BE/OP XenericSampler • Migrating towards a post-processing only system • Migration to FESA 3 done (some secondary features missing) • Plan to start with FESA 3 version in the injectors

  15. BE/RF • Linac4: PLC control in FESA3 + plan move the power & low-level • AD: 4 classes (stocatic cool + meas) in FESA3 • Old control (GM)  see ACCOR planning • SPS: new dev (power and LL) in FESA3 • LHC: new dev (damper) in FESA3 • !! SPS & LHC = 130 FESA2 classes !! • Some LHC systems (cavity control) are planned to be renovated before the start-up

  16. FESA 3 Adoption in EN

  17. EN/ICE SIC • QPS: Migrated to FESA 3 & under validation. Only solution for operation • Totem roman pots: migration foreseen from January 2014 PLC • LHC Cryo: migrated to FESA 3 & under validation. Plan to use FESA3 in operation • Survey: migration in progress (waiting for cryo validation). Plan to use FESA3 in operation MTA • Mainly FESA as communication layer (IEPLC) • Migration on-going and nothing critical for start-up

  18. EN/STI • ECE • Baseline: migrate everything to FESA 3 pending validation • Ongoing validation with LHC Collimator (critical class) (90% done) • Will follow SPS, PS… • LP (laser) • Renovation of an ISOLDE system (new dev FESA3) • Photolab: Migration not started yet. Not critical (lab)

  19. FESA 3 Adoption in TE

  20. TE/ABT • All new dev in FESA3 (LN4 pre-chopper…) • LEIR Kickers GM migrated to FESA3 • PS Continuous Transfer migrated to FESA3 • PS KFA4, 13, 21 stay in FESA2 (FESA3 later – TS) • SPS MKP, MKE6 in FESA3. MKE4 and MKD will follow pending validation • LHC MKI in FESA3. • LBDS will be migrated to FESA3 for the tests end of April.

  21. TE/CRG • FESA part handled by EN/ICE/PLC • LHC Cryo in FESA 3 under validation • Operational baseline

  22. TE/EPC • 99 % migrated to FESA 3 (1 REX power converter missing) • Many devices already migrated in the DB • 600 devices (PLC, RS422) to be migrated (Dec) • Complete migration should be completed for the start-up

  23. TE/MPE • FESA2 classes for BIS, FMCM and SMP • Migration not started yet (tests with 1 BIS class) • Busy with PostMortem & RDA3 • Migration planned for 2014 or 2015 • QPS (see EN/ICE/SIC) • Migrated to FESA 3

  24. TE/MSC • New development for PS B-train • Will be in FESA3

  25. Other groups • DGS-SEE • ARCON renov. • Operational deployment in S2 2014 based on FESA3 • PH-DT • Totem roman pot (See EN-ICE-SIC) • Possible new development  FESA3 if anything

  26. Conclusions • The ACCOR Operational baseline is FESA 3.1 • Many groups have started the migration to FESA 3 • Some groups with huge code base a bit behind • FESA team proposes active support (on location) to speed up migration • Many critical systems are planned to restart with FESA 3 (QPS, Cryo, Collimators, many kickers, power converters…)

More Related