Reconstruction and capacity building of the Sawmill and Pallets production

Reconstruction and capacity building of the Sawmill and Pallets production. Investment Plan. Pelex Ltd Cazin Mala Lisa bb Cazin 77 220 Bosnia and Herzegovina. Project location. Bosnia and Herzegovina Bosanski Petrovac. Our project location .

tanek
Télécharger la présentation

Reconstruction and capacity building of the Sawmill and Pallets production

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Reconstruction and capacity building of the Sawmill and Pallets production Investment Plan Pelex Ltd Cazin Mala Lisa bb Cazin 77 220 Bosnia and Herzegovina

  2. Project location Bosnia and Herzegovina Bosanski Petrovac

  3. Our project location Comparative advantages compared to the other locations: Geostrategic position of the location: Raw material availability, Reduced expenses of the raw material transportation, Annual etat on this location is: ca. 1.200.000 m3 All necessary permits and infrastructure secured Distance to nearest harbour is less than 250 km (Rijeka - Croatia) Distance to major Central -European cities is less than 500 km

  4. Investment objectives: *Reconstruction and capacity building for:- The sawmill production of 60.000-80.000 m3/y,- The pallets production of 4 pc’s/min Why should you invest with us? • Income Tax 10 % • Capital Gain Tax 0,0 % • Income Tax is 0% if the export of goods are more than 30% of production EBIT MARGIN 28,57 % MIRR 27,17% (Best Case Scenario) MIRR 14,75 % (Worst Case Scenario) Investment Payback period is 3,08 years Very good geostrategic position and raw material availability Proven business and financial capability of Amadint Ltd. Cazin Good prospects of future production and final product placement

  5. Pallets Warehouse 3.721,42 m2 Designed situation Sawmill final product Warehouse 6.367,51 m2 Access road Raw material Warehouse 6.565,48 m2 Pallets production facilities 1.640,20 m2 Sawmill

  6. Financial Investment Value: CAPEX: 2.404.908 € OPEX: 1.789.522 € Total Investment: 4.194.430 € Funds neccessary for the project implementation: 2.874.483 € Investment Payback period: 3,08 years EBIT MARGIN 28,57 % MIRR 27,17% Contact information: The Project Leader: Pelex Ltd Cazin Mala Lisa bb 77 220 Cazin +387 37 512 555 www.pelex.ba info@pelex.ba Investor/Partner: Amadint Ltd Cazin 101. MUKBR bb 77 220 Cazin +387 37 511 531 www.amadint.ba info@amadint.ba