An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 257VALUE ENGINEERING Dr f Dejahang (BSc CEng, BSc (Hons) Construction Mgmt, MSc, MCIOB, PhD)

  2. Value Engineering-Constructability • VALUE ENGINEERING • Value Engineering (VE) has been defined as: • the systematic effort directed at analyzing the functional requirements of: • systems • equipment • facilities • procedures • and supplies for the purpose of achieving the essential function at the lowest total (life-cycle) cost.

  3. Value Engineering-Constructability • Also, all the efforts are focused on meeting needed issues such as: • Performance; • Reliability; • quality, maintainability; • aesthetics, • Safety; • fire resistance; • while, at the same time, achieving lowest life-cycle cost.

  4. Value Engineering-Constructability • Constructability implementation can act as a predecessor to value engineering. • Providing information through constructor input and lessons learned from past projects such that value engineering may be more effective.

  5. Value Engineering Implementation of value engineering involves several steps: • Information; • functional analysis; • creative mind; • Evaluation; • planning & proposal; • Implementation; • follow-up.

  6. Value Engineering • The creative step involves a brainstorming session where life-cycle cost alternatives, for design components are considered. Value engineering may be performed in two ways: • (1) Proactively • (2) Reactively

  7. Value Engineering(Value Analysis) • What Is Value Engineering? • Value Engineering (V.E.), also known as Value Analysis, • is a systematic and function-based approach to improving the value of products, projects, or processes. • VE involves a group of people following a structured process. • The process helps team members communicate better across boundaries. • understand different perspectives, • innovate, and analyze.

  8. Value Engineering • What does Value Engineering do? • Value Engineering improves value. • On a major road development, improvements to value might include: • reducing the life cycle cost of an interchange, enhancing safety in a design; • or reducing impacts to the public by shortening the duration of a construction project.

  9. Value Engineering • Value Engineering uses a combination of creative and analytical techniques to identify alternative ways to achieve objectives. • The use of Function Analysis differentiates Value Engineering from other problem solving approaches. • VE focuses on delivering the product or service at the best price. • This is achieved by incorporating those value characteristics deemed most important by the customer.

  10. Value Engineering How does V.E. work? • V.E. follows a structured thought process to evaluate options. • Every V.E. session goes through a number of steps: • Gather information -What is being done now? • Measure Performance -How will the alternatives be measured?

  11. Value Engineering • Analyse Functions -What must be done? What does it Cost? • Generate Ideas (Brainstorming) -What else will do the job? • Evaluate and Rank Ideas -Which Ideas are the best? • Develop and Expand Ideas -What are the impacts? What is the cost? What is the performance? • Present Ideas Sell Alternatives

  12. Value Engineering People involved in VE should be able of establishing the following: • effective challenge to design criteria and accepted standards; • access and evaluation of operational and maintenance cost; • focus on high cost areas and replace with lower; • selection of effective alternatives.

  13. Value Engineering There are four important steps most be taken in modified VE job plan. They are as follow: • 1. Information Phase • -Briefing by the Client • -Feasibility study with client presence, • -Outline proposals • -Scheme design

  14. Value Engineering 2-VE Steps Validation or preparation of cost estimate • Familiarisation and breakdown of data into elements-cost models • Functional evaluation of areas to isolate high cost, poor value areas, 3-Speculative Phase • Team review of project-idea listing • Development of final idea listing.

  15. Value Engineering 4-Analytical Phase • Evaluation of ideas listing • Selection of high cost areas for in-depth study, • Team brainstorming for generation of possible alternatives suitable for in-depth analysis • Investigate alternatives • Team review of analysis • Preparation of proposal drafts.

  16. Value Engineering Proposal Phase • Review of results from analytical phase with client to gain additional information and enhance implementation. • Review and revision of proposal • Preparation of final proposals • Report, including cost estimate review

  17. Value Engineering • What are the benefits of V.E.? • Value Engineering is a tool that will improve Mangers ability to manage projects; • solve problems; • Innovate; • communicate. • A VE program in an organization will give the organisation a definitive tool to improve value in any product, project or process.

  18. Value Engineering • The advantages of carrying out a VE are: • Cost savings; • risk reduction; • schedule improvements; • improved designs and better collaboration have been the outcomes of investment in VE studies. • The return from the investment in VE normally exceeds 10:1.

  19. Value Engineering CASE STUDY • A commercial office development was to be constructed using JCT 2007 following the completion of the design. • The client was reluctant to accept the financial feasibility study. • Therefore, it was decided to VE the design down to an acceptable cost.

  20. Value Engineering Solution • The value engineering team decided during the initial information stage to target 3 main areas, such as; • primary criteria: ratio of net let table area to gross building area

  21. Value Engineering • architectural review: attempting to relax specifications without affecting the overall quality of the building. • The basement, plant rooms, service cores and the cladding system were all identified as possible targets.

  22. Value Engineering • engineering review- targets included: • superstructure • public health requirement • smoke extraction systems • environmental services installations. • A brain storming approach was adopted for the creation of alternative ideas. • The scope of value improvement was listed as:

  23. Value Engineering • the basic shape of the original design was critical as being wasteful in terms of the resultant net let table floor area. • Alternatively proposals were made for improving floor layouts, leading to 80% net let able floor area, compared to the 75%.

  24. Value Engineering • potential savings were identified by concentrating the major plant items in the basement areas and reducing the extend of the basement ductwork by relocating the air shafts. • Rationalisations were also suggested for the layout and number of lift cores.

  25. Value Engineering • a significant simplification was perceived to be possible if the dimensions of the central atrium and the width of the entrance were adjusted to coincide with the structural grid. • build ability principles were applied to the external cladding resulting in the suggested use of composite steel framed panels to fit the storey heights and column centres.

  26. Value Engineering • The proposed toilets were also reviewed and a considerable saving was recognised as being possible by the incorporation of pre-fabricated toilet pods. • Form the cost figures it can be seen that the alternative design proposals represented a construction saving of 2.1 million. • The cost of VE WAS £43,000.

  27. Value Engineering

  28. Value Engineering