An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Environmental Health and Safety Committee4-30Health & SAFETY Update Lee Wilmot TTM Technologies February 2007

  2. Health & SAFETY Update • 2005 BLS Injury Rate Data Review • OSHA Citations for PWB Industry • Latest Inspections • Regulatory Agenda Actions

  3. Health & SAFETY UpdateBLS Injury Data While injury rates are prime focus, the BLS database contains average employment data by industry

  4. Health & SAFETY UpdateBLS Injury Rates

  5. Health & SAFETY UpdateBLS Injury Data In addition to average injury rates by NAICS code, the BLS database shows injury rates by facility size

  6. Health & SAFETY UpdateOSHA Citations • OSHA citations SIC 3672 (Oct’05-Sept’06) • 12 inspections (down from 13 & 18 in prior years) • 65 citations (compares to 63 and 88 in prior yrs) • $21,625 in penalties (v $14519 and $26,464) • Top standards cited (# cites/ # inspects/ penalty) • Haz Com (1200) still #1 • 9 / 5 / $2400 v 11 / 6 / $2671 • Lockout Tagout (147) #2 - 8 / 3 / $3300 • Resp Protect (134) still #3 • 5 / 2 / $425 v 7 / 4 / $1350 • Lead (1025) #5 (was #2) • 5 / 3 / $1750 v 8 / 4 / $438

  7. Health & SAFETY UpdateOSHA Inspections OSHA inspections and citations of PWB industry up from 2005 levels • 1/1/6-12/31/6 period shows 48 inspections (46 in 05) with 144 (up from 97) violations at 39 locations (up from 25) • 26 complaints, 17 planned, 3 referrals, 2 other • Only 1 No Inspection/Out of Business (was 7) • Many companies not recognized >> IPC members? • Altek Electronics, Empire Electronics, International Electronics, Micron Laser Technology, Minco Products, Newonics Inc, Simhof Manufacturing, Titan PCB West

  8. Health & SAFETY UpdateOSHA Semiannual Regulatory Agenda Agenda Published 12/11/2006 • Completed Rules • Assigned Protection Factors for Respirators • Updates to Electrical Standards • New Poster Requirement • Final Rule Stage • Employer Payment for PPE • Proposed Rule Stage • Updates to National Consensus Standards • Walking Working Surfaces & Fall Protection • Prerule Stage • Hazard Communication • Ionizing Radiation • Emergency Response & Prepardness

  9. Health & SAFETY UpdateOSHA Regulatory Completed Rules • Assigned protection factors (APFs) and maximum use concentrations (MUCs) for respiratory protection standard (134) • Final rule published Aug. 24, 2006 (71 FR 50122) Effective 11/22/2006 • APFs from ANSI Z88.2-1992 adopted • PWB industry impacts • Revised Table 1 1910.134(d)(3)(i) • Lead std. 1910.1025(f)(3)(i) • Formaldehyde std 1048(g)(2) & (3)

  10. Health & SAFETY UpdateOSHA Regulatory Completed Rules • Revise & Update subpart S Electrical Stds • Final Rule published February 14, 2007 72 FR 7135 Effective August 13, 2007 • Based on 2000 edition of NFPA 70E & 2002 edition of National Electric Code • Rule focuses on SAFETY in design and installation of electrical equipment • Reference to 1971 NEC in powered platform standard changed

  11. Health & SAFETY UpdateNew Poster Requirement

  12. Health & SAFETY UpdateOSHA Semiannual Regulatory Agenda • Final Rule Stage • Employer Payment for PPE • In 1999 OSHA proposed employers pay for required PPE, with few exceptions • Reopened comment period in 2004 to get input on PPE considered as “tool of the trade” • Comment period ended 08/23/04 • Final action projected in May 2007

  13. Health & SAFETY UpdateOSHA Semiannual Regulatory Agenda Proposed Rule Stage Standards Update to National Consensus Standards • Current standards adopted in 1970-72 • OSHA stds reference consensus stds that are outdated or out of print • Multi-year project started 24 Nov. 2004 • 1st Final Rule published 13 Sept 2005 and Was Effective 14 Nov. 2005 (flam & combust liquids, arc welding & cutting, etc)

  14. Health & SAFETY UpdateOSHA Semiannual Regulatory Agenda • Proposed Rule Stage • Update of Walking Working Surfaces and Fall Protection Standards • Current standards do not include available technologies & procedures to protect EEs from slip, trip and fall hazards • NPRM and hearing in 1990. Re-opened record in 2003. Comment period ended 7/31/2003. • New NPRM projected in October 2007

  15. Health & SAFETY UpdateOSHA Semiannual Regulatory Agenda • Pre-Rule Stage • Ionizing Radiation (1910.196) • Request for Information Extended 11/28/05. • Stakeholder meetings projected April 2007. • Emergency Response & Preparedness • Request for Information Projected May 2007. • Hazard Communication • Remember Globally Harmonization System (GHS) to match 2003 UN proposal by 2008 (Reg Plan Seq No. 83)

  16. Health & SAFETY Update Keep in Touch with EHS Issues • Visit the Website at www.ipc.org under “Legislative and Regulatory Affairs” • Subscribe to the EHS Update • Join Compliance Net email forum Contact: Fern Abrams, IPC Director of Environmental Policy (202) 962-0460, fabrams@ipc.org Bret Bruhn, EHS Committee Chairman (503) 992-4689, bret.bruhn@merix.com Lee Wilmot, EHS Committee Vice Chairman (860) 684-8000 x 4702, lee.wilmot@ttmtech.com