Store Summary
90 likes | 106 Vues
Stay updated with the latest numbers, Lum, integrated work, and studies completed at Tevatron. Also, get insights into the problems faced and solutions implemented for improved efficiency.
Store Summary
E N D
Presentation Transcript
Store Summary Tevatron Coordinator - FNAL
Numbers for the week Tevatron Coordinator - FNAL
Lum for the week Tevatron Coordinator - FNAL
Integrated for the Week Tevatron Coordinator - FNAL
Studies/Work Completed • BOS to work on system to increase pbar transverse emittance. (currently blowing up Emit at injection). • After Quench on Store 5843 parsed squeeze and redefined orbit, tunes and coupling. These are big changes. Tevatron Coordinator - FNAL
Problems • Replaced regulator for T:VC43 after tripping during shot setup. • D17V separator spark (little loss of lum) • RF station trip during store. (little loss of lum) Tevatron Coordinator - FNAL
Pbar Brightness Squeeze Quench Store 5843 Tevatron Coordinator - FNAL
D0 Losses in Squeeze after Parse LMC4SM LMB1SD Tevatron Coordinator - FNAL
Rough Results of Pbar Emit growth Used PBJ to increase Pbar emittance Store 5852 Store 5850 Tevatron Coordinator - FNAL