Waste Seminar for Fenland Green Business Club

Join the Fenland Green Business Club for a Waste Seminar on April 27, 2010. Learn how Resource Efficiency East can help SMEs improve their performance and reduce waste.

tfreed
Télécharger la présentation

Waste Seminar for Fenland Green Business Club

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Resource Efficiency East • Fenland Green Business Club Waste Seminar • 27th April 2010 • Simon Chiva • Programme Manager

  2. About Resource Efficiency East • Resource Efficiency Business Support Programme for Small to Medium Sized Enterprises • £2.1 Million funding from East of England Development Agency and the European Regional Development Fund • Runs until March 2011 • Programme managed by Renewables East

  3. Resource Efficiency Objective To achieve ‘a measurable improvement in the performance of regional SMEs.’

  4. Resource Efficiency Objective VIDEO CASE STUDY

  5. Case Study 1 - Plastic Extrusion Company Employees 38 people Plastic sprue (mould) was disposed of to landfill as part of general waste skip using an 8yd3 Skip Approximately 4m3/ week = 1 tonne/ week  or 50 tonnes a week 50 tonne x 4m3 = 200 m3 / 0.76455 (metres to yards) 261.59 yd3 / 8 yd3 = 32 skip lifts @ £100 = £3,200

  6. Case Study 2 - Joinery Company Employees 18 people Between May 2008 and April 2009, the cost waste service was £5,941 and based on the most recent 4-months between May and August 2009 is predicted to increase to £6,672 for the following year. The cost of heating using the gas convection heaters was £6,295 (169,687 kWh) for the same year. A combined cost of £12,236 per annum

  7. Case Study 2 – Joinery Company Purchase of two 150kW wood-fired convector heaters to replace the two existing 145kW gas-fired heaters and allow burning of the Company’s waste wood as a fuel to heat the factory. Cost of two 150kW wood-fired convector heaters = £20,500 installed. Savings in waste disposal = £5,941 per annum or 20.8 tonnes. Savings in gas use for heating = £6,295 per annum or 169,687 kWh. Payback period = 1.7 years.

  8. Case Study 3 – Steel Fabricator

  9. Why Resource Efficiency? BEST PRACTICE?

  10. “Statistics released from Envirowise in 2007 indicated that 79% of the UK’s SMEs regard environmental issues as important to their business, but a third have yet to take action – with a lack of time cited as a common obstacle”. Envirowise, www.envirowise.gov.uk

  11. Services - Self Help Tools

  12. Self Help Tools

  13. Services; 1-2-1 Services • The Programme offers four resource efficiency business support services delivered by our expert panel; • Business Resource Review • Water Efficiency Review • Environmental Management System (EMS) Review • Low Carbon Feasibility Study

  14. Services; 1-2-1 Services Business Resource Review • The Business Resource Review, Water Review and EMS Review, Support available to individual businesses: • On-Site Review- Identify potential areas of resource-use reduction opportunities or assist with practice/process • Review Report - highlights the key opportunities, solutions. Quantifying the environmental and financial benefit of resource-use improvement. • Ongoing Support - Work with the company –at arms length - to implement recommendations and achieve the financial benefits identified in the report.

  15. Services; 1-2-1 Services • Business Resource Review – A review or audit of resource use within a business covering water, waste and energy • Water Efficiency Review - A review designed specifically to reduce water-use in businesses – for those businesses which have a high water demand

  16. Services; 1-2-1 Services • EMS Review - A benchmarking, gap-analysis and cost/benefit analysis exercise for organisations wishing develop and implement an environmental management system (EMS) • or for those whose EMS is unaccredited

  17. Low Carbon Feasibility Studies • Working with companies requiring detailed technical and financial information to fully explore potential solutions requiring capital investment. • Providing further information on the full range of potential solutions, including • appraisal of relevant technologies • the benefits of investing – financial & environmental • detailed cost benefit analysis • assessment of pay back periods • support identifying appropriate financial support e.g. grants,loans

  18. Feasibility Studies • Support available to individual businesses; • Up to 5 days on-site review by consultant for the collection and assessment of the opportunity • A bespoke report and action plan providing details of the findings of the feasibility and detailing the recommendations • - Up to 10 days follow-up support to assist the customer to understand feasibility report and implementation the project

  19. Feasibility Studies • Opportunities qualifying for this support could include; • - Space Heating • - Lighting • - Cooling/Refrigeration • - Process optimisation • - Renewable/Low Carbon Energy Opportunities • Water Technologies

  20. Environmental Management System (EMS Club) • Aim is to assist businesses to understand and implement an environmental management system through a series of workshops designed to encourage knowledge exchange and peer-to-peer networking. • First session is a taster about EMS and the business benefits

  21. Environmental Management System (EMS Club) • Support available to individual businesses: • A place at a series of ten monthly half-day training workshops; • All the necessary guidance, tools and templates required to develop the required EMS documentation and records; • Direct support from our EMS experts in the form of an EMS Review and ongoing support

  22. Contact Details Tel: 01733 294524 Email: info@resourceefficiencyeast.org.uk Web: www.resourceefficiencyeast.org.uk