An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lab Status Meeting, Technical Division Anna Grassellino April 17th 2017

  2. Presenter | Presentation Title

  3. SRF Sector Update 2017-04-17 • R&D- Vertical Test (VT): cryogenic tests to study effect of low RRR material on surface resistance and magnetic flux trapping; Material Science Lab (MSL): SIMS and PPMS studies ongoing; Dilution Fridge for Quantum Computing Procurement moving forward • One 9-cell and two 1-cell cavities EP processed • One 9-cell newly doped, one 1-cell got 120C nitrogen infusion and one 1-cell had 1300C very long bake-out. • Three 1-cell cavities were assembled in cleanroom • One 1-cell cavity was baseline vertical tested for further R&D activities • LCLS-II: cryomodule 2 moved to CMTF; CM 3, 4, 5 moving forward, CM 6 has 5 cavities qualified • Four 1.3GHz cavities were vertical tested and qualified • One 3.9GHz Cavity was light BCP’d • CM02 was moved to CMTF and being installed. • CM03 is in WS3 stage • CM04 is in WS2 stage • CM05 is in WS0 stage with 7 cavities completed with coupler cold ends • PIP-II: successful P2MAC review; cavity studies moving forward; issues at MDB/LAB2 • One 650 MHz 1-cell cavity was assembled in clean room for vertical test • Two 650 MHz 1-cell cavities were clean room prepared for furnace bake out • One spoke cavity was light BCP processed and assembled in cleanroom for horizontal test Presenter | Presentation Title

  4. Weekly Lab Status for Magnets Sector Summary • LCLS II – SPQA104 shipped to Jefferson Lab. Repair of LCLS-II magnet SPQA105 completed, preparations for cryogenic tests, good progress on the second top head fabrication for Stand 3 • LARP - Vacuum epoxy impregnation of the first 4.2-m, production length coil, QXFA101 is complete. Completed load testing of the new LARP Top Plate assembly, started mechanical and electrical integration for testing of the LARP 2-m long magnet MQXFS1c • Last week the MQXFA1 (1st 4-m long) conductor and coils readiness review was completed. • AS – Preparation for the first coil epoxy impregnation for the Muon g-2 EDWA magnet (spare) is in progress. • Mu2e – Making steady progress on the TS coil module test facility. Completed cryo piping connections, insulation, and electrical instrumentation of Transport Solenoid prototype on dished head #A, for installation into cryostat next week. The SC lab measured the critical current (Ic) of two cable samples for DS solenoid as part of the QA program. • PIPII – Medium Energy Beam Transport (MEBT) triplets received from India (BARC), assembled on the stands, one triplet is ready for magnetic measurements • G-2 – Inflector parts are prepared for winding, tooling is finalized, the delivery of the NbTi shield material from Japan to Fermilab is being discussed. • 15T dipole R&D – Conceptual design studies of 15-16 T dipoles continue – first results on stress management in cos-theta coils were presented at the US Magnet Development Program (MDP)-FCC-EuroCirCol video meeting. Layer 3 winding completed in the first coil • Infrastructure – removing old Tevatron equipment, feeder cables for TeVtest stand power system were disconnected Weekly Lab Status for Magnets Sector

  5. Cryogenic Sector • Organization • Requested meeting with PPD Senior Management for finalize cryogenic expertize consolidation by the end of FY17 • Operations • Shutting down MTA cryogenic system at the end of April, 2017 • NML and CMTF are being prepared for cooldown • VCTF is operational • Projects • LCLS- II Cryogenic Distribution System • Tunnel Transfer line has been delivered to SLAC • Conducting Feed Cap 1 & 2 inspection at SLAC • End Caps are being delivered to SLAC • Started Distribution Box fabrication • Infrastructure upgrades • Dilution refrigerator procurement • Safety • Issued PPMS (MSL) ORC Technical Division – weekly status meeting