Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL

Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL. Acknowledgement: Mark Clark, Research Assistant Professor Soil and Water Science Department. The road will traverse a recharge area.

tierra
Télécharger la présentation

Water Quantity and Quality Considerations of the Extension of SW 24th Avenue through NATL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Water Quantity and Quality Considerationsof the Extension of SW 24th Avenue through NATL Acknowledgement: Mark Clark, Research Assistant Professor Soil and Water Science Department

  2. The road will traverse a recharge area • Most of the proposed roadway East of 34th Street is through a “closed basin” that has no surface outlet. • The paved 24th Avenue extension will significantly reduce the area where storm water now collects and eventually seeps into the ground.

  3. Stormwater Pond Collapsed Sink Hole Sinkhole Pond Car Wash Archer Woods Regency Oaks

  4. Regency Oaks Archer Woods

  5. Areas of flooding with moderate rainfall events

  6. Collapsed Sinkhole… behind Regency Oaks (moderate rainfall)

  7. Flooding into NATL from collapsed sinkhole

  8. Sinkhole Pond… Normal conditions

  9. Sinkhole Pond… Moderate rainfall

  10. Flooding from Sinkhole Pond after heavy rainfall

  11. CLOSED BASIN... Any runoff within proposed right of way will have to be stored in a retention basin until the water volume infiltrates into the ground or is lost to evapotranspiration.

  12. In addition to the roadway... retention ponds may be necessary within the NATL 25 year storm 100 year storm 5 year storm 1 year storm

  13. In closed basins water quality entering the Floridan Aquifer is a concern...