1 / 7

Rube Goldberg Project

Rube Goldberg Project. Chain Reaction Machine. The Problem. Some people don’t believe in working together or sharing ideas. The Mission.

toni
Télécharger la présentation

Rube Goldberg Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rube Goldberg Project Chain Reaction Machine

  2. The Problem Some people don’t believe in working together or sharing ideas. The Mission Your mission is to build a Rube Goldberg chain reaction machine that demonstrates teamwork. You must work on a team of two. Each team must build a component of the chain reaction, passing a ball from one component to another. At the end of the chain reaction, the machine must display a joke or throw candy or make music or squirt water.

  3. Teamwork is Crucial! Plan and design. Build modules. Document results. Connect each team’s component. Test the chain. Take pictures for the website. Present project to the world. There’s a lot to do! If we don’t work together, then neither will our machines work together!

  4. Rube Goldberg Machines on YouTube Rube Goldberg Machines from Japan #1 (9:30 min) http://www.youtube.com/watch?v=fVZ07isS-po Honda Ad http://www.youtube.com/watch?v=FGngcQb_0qg There are no computer graphics or digital tricks in the film. Everything you see really happened in real time exactly as you see it. The film took 606 takes. On the first 605 takes, something, usually very minor, didn't work. They would then have to set the whole thing up again. The crew spent weeks shooting night and day. The film cost six million dollars and took three months to complete including a full engineering of the sequence.

  5. You Get Points For: Most number of modules used in your component Best looking as voted by your peers Teamwork! Working together and exchanging ideas

  6. Modules Modular construction is BIG! Break your solution into simple motion and structural modules. You may find instructions for useful modules in Build-It-Blocks.

  7. Look Good way-cool colors Decorate our modules! -make cool characters -draw signs the way -use many and shapes -be neat and organized A good idea that looks ugly … may not get the attention it deserves!

More Related