1 / 2

Action Items from SSSC #39 (Dec. 10, 2008) & #40 (April 27, 2009)

Action Items from SSSC #39 (Dec. 10, 2008) & #40 (April 27, 2009) 40-1 (J. Carter): provide SI teams with access to requirements and current status/problems of MCCS 40-2 (S. Jensen): implement door/TA offset parameter to compensate for offset

totie
Télécharger la présentation

Action Items from SSSC #39 (Dec. 10, 2008) & #40 (April 27, 2009)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Action Items from SSSC #39 (Dec. 10, 2008) & #40 (April 27, 2009) 40-1 (J. Carter): provide SI teams with access to requirements and current status/problems of MCCS 40-2 (S. Jensen): implement door/TA offset parameter to compensate for offset between commanded and actual door position. 40-3 (M. Toberman): clarify badging process at DAOF, particularly for foreign nationals. 40-4 (B. Meyer, E. Young): Synchronize platform schedule (especially short science related work) with SI teams. 40-5 (P. Temi): make drawings of secondary mirror buttons available to SI teams. 40-6 (P. Temi): clarify perspective of aluminized tertiary. 40-7 (T. Roellig): Send copies of the "SOFIA Science Vision" and the "Case for SOFIA" to the NRC for inclusion in the Astro2010 Decadal Review documentation. Roellig will contact NASA HQ to get a read on their preference for how best to handle this.

  2. 40-8 (T. Roellig, E. Becklin): Put Science Vision on arXiv/astro-ph. 40-9 (E. Young with input from all): Choose and invite new SSSC members. 40-10 (M. Morris): Refresh past action items, post them on the SOFIA web site, and check their status. 40-11 (S. Goodwin): put all SSSC presentations, past and present, on the website. ______________________________________________________________ 39-01 (S. Jensen): Place one of the PI racks so that the displays can be seen from the seats (from T. Herter) 39-02 S. Jensen: In the Build level diagram put delivery dates at the levels (from T. Roellig) 39-03 S. Jensen & B. Meyer: Check what analysis tools are in place to check image quality obtained during first flights, in case we run into a problem there. 39-04 E. Becklin: Consider a SOFIA Herschel joint workshop in summer 2011. 39-05 M. Morris: Discuss Hubble fellowships for SOFIA at next SSSC meeting

More Related