Inspection and Testing

Inspection and Testing. Approved for Public Release. Introduction. All materials and services supplied to Electric Boat must be inspected and tested in accordance with Purchase Order invoked specifications, drawings, standard clauses, etc.

tranquilla
Télécharger la présentation

Inspection and Testing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Inspection and Testing Approved for Public Release

  2. Introduction • All materials and services supplied to Electric Boat must be inspected and tested in accordance with Purchase Order invoked specifications, drawings, standard clauses, etc. • Determine if supplier or government have additional or more stringent requirements. Inspection and Testing Approved for Public Release

  3. Introduction (continued) • Purchase order imposes inspection systems via EB2678 and Standard Clauses (60-5, 60-19, 60-58) for MIL-I-45208, MIL-Q-9858, or ISO9000 series • Accordingly, suppliers must establish and maintain a compliant inspection system • System must also address subtier suppliers • Be aware of Supplemental Technical Requirements (60-58 STRs) for ISO9000 Inspection and Testing Approved for Public Release

  4. Introduction (continued) • Inspection and Testing that result in OQE must be performed by a supplier’s organization independent of production, i.e., the Quality Control Department. Inspection and Testing Approved for Public Release

  5. 3 Basic Types of Inspection: • Receiving Inspection verifies acceptability of materials, services, and associated documentation at receipt. Inspection and Testing Approved for Public Release

  6. 3 Basic Types of Inspection: • In-Process Inspection performed at manufacturing stages deemed necessary to verify: • internal compliance with requirements as production progresses, statistical process control charting, non-accessible assembly, etc. • as required by the purchase order, drawing, or specifications to be an EB or Government Hold/Witness Point (SC37-8 series). Inspection and Testing Approved for Public Release

  7. 3 Basic Types of Inspection: • Final Inspection shall verify that the product is dimensionally acceptable, properly assembled, and the documentation is satisfactory in accordance with the purchase order. Inspection and Testing Approved for Public Release

  8. Requirements • Inspection and Testing must be accomplished using clear, complete, and current procedures and instructions • Inspection and Testing shall be performed in appropriate environmental conditions with respect to temperature, humidity, noise, vibration, etc. Inspection and Testing Approved for Public Release

  9. Requirements (continued) • Instruction needs to specify: • Source of the inspection or test criteria • drawing, specification, standard clause, etc. • Gaging or tooling required to ensure proper accuracy of measurements • Provision for recording the actual results as objective quality evidence for reference Inspection and Testing Approved for Public Release

  10. Requirements (continued) • When required by a standard clause (10, 60, 76 series), drawing, or specification, procedures shall be approved by Electric Boat on a Vendor Procedure Approval Request (VPAR), priorto performance of the testing. Inspection and Testing Approved for Public Release

  11. Requirements (continued) • Examples of Testing Procedures requiring Electric Boat approval: • NDT Procedures • Noise Testing Procedures • Shock Testing Procedures • Vibration Procedures Inspection and Testing Approved for Public Release

  12. Requirements (continued) • Examples of Testing Procedures requiring Electric Boat approval (continued): • Forging test specimen location drawings • Production Procedures (when specified by the Purchase Order or Procurement Specification) • Qualification and First Article Procedures (when specified by the Purchase Order or Procurement Specification) Inspection and Testing Approved for Public Release

  13. Electrical Testing Dielectric Voltage Withstand Test • Dielectric Voltage can be a Destructive test. • Voltage Level and time should be considered. • Example: Operating Voltage is 440VAC • Test at 2 X 440 +1000VAC= 1880VAC Inspection and Testing Approved for Public Release

  14. Electrical Testing Insulation Resistance • An Insulation Resistance test is normally done with DC and is usually performed at a lower voltage level such as five (500VDC) hundred volts. An IR test measures the quality of the insulation system and provides a measure in ohms or megohms. It is sometimes used before a HiPot Test as both a predictor of a failure condition and to provide a quantitative value of the insulation system. • Often performed before, during and after Hydro on Electrical Hull Penetrators. Inspection and Testing Approved for Public Release

  15. Electrical Testing Continuity • Determines if there is an uninterrupted electrical connection between two points. • Resistance or DC Resistance • Measured in ohms • The opposition to current flow • Report actual results EX: > 1 Ohm Inspection and Testing Approved for Public Release

  16. Documentation • Inspection and test results shall be documented, preferably on a company form with letterhead. • Inspection and test results must clearly indicate: • the type and number of inspections or tests performed • the results of the inspection or test • the signature/date of personnel performing the test • additional requirements of the applicable SC76-9 series Inspection and Testing Approved for Public Release

  17. Documentation (continued) • When required by the Purchase Order, generally a Standard Clause, the Inspection and Test Reports shall be provided to Electric Boat. • Inspection and Test Reports shall not contain any qualifying statements, such as “to the best of our knowledge”, “while in our possession”, “approximately”, etc. Inspection and Testing Approved for Public Release

  18. Documentation (continued) • All instruments, gages, and tools used to perform official inspections and tests must be calibrated in accordance with a documented calibration program. • Actual instruments, gages, and tools used to perform official inspections and tests should be identified and listed in the inspection or test report: • provides additional objective quality evidence • traceability if gage out of calibration Inspection and Testing Approved for Public Release

  19. Documentation (continued) • Inspection Records and Test Reports shall be traceable back to the product being tested or inspected and the applicable procedures or instruction being used. • Corrections of errors on Inspection Records or Test Reports shall be in accordance with the requirements of Electric Boat Specification 2678. Inspection and Testing Approved for Public Release

  20. Suggestion • Initiate a method and procedure defining type and accuracy of gages to be used for dimensional inspection of particular attribute tolerance ranges • Gage for +/-.020” tolerance different than +/-.0005” tolerance as is a 50psig test different than a 500psig test • 10% rule Inspection and Testing Approved for Public Release

  21. Suggestion • To better ensure that the integrity and caliber of the inspection system and the personnel are being maintained: • Implement an overcheck program that periodically confirms inspector results • Implement a refresher training and qualification program for inspectors (similar to NDT, welding, etc.) Inspection and Testing Approved for Public Release