An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Western Area Power AdministrationOpen Access Transmission Tariff Ron Moulton Western Area Power Administration September 14, 2004

  2. Agenda • OATT Revision Effort • Revisions to Accommodate LGI • Other Revisions • OASIS • wesTTrans.net • Transmission Business Unit • Contact Information

  3. Western OATT Revision Effort • Goals • Prepare Revised OATT for Filing, Spring 2005. • Comply with Western’s Core Mission • Obtain FERC Approval • Support by Customers • Coordinate with Western’s General Requirements for Interconnection

  4. Large Generator Interconnection • Analyzed Pro Forma LGI IA/IP • Minimized Pro Forma variations • Areas of Modification Recommended • Protect Statutory Obligations • Maintain Non-Jurisdictional Status • Account for Federal Laws • Payment of Interest • Do Not Pay Taxes

  5. Large Generator Interconnection • Elimination of Liquidated Damages Provisions • Use of Reasonable or “Best” Efforts • Payment of Actual Costs • Advance Payment for Network Upgrades • Network Upgrade Crediting Policy • 40 Year Term Limit • NEPA Compliance

  6. Other Revisions • Application Fee & Deposit • Network Operating Agreements & Committees • Advance Payment for Ancillary Services • Creditworthiness • Contingent Upon Appropriations • Transmission Peak Calculation Methodology

  7. Other Revisions • Clarification of Attachment K Coverage for Transmission Used to Deliver BCP Electric Service • Eliminate “Change of Rates” Language from Attachment J • Accommodate Longer-Term Non-Firm Service • Energy Imbalance Schedule Modified • Roll-Over Language in Service Agreement • Several “editorial” Updates

  8. Schedule • Spring, 2004 • Assemble OATT Revision Team • Summer, 2004 • Develop Proposed OATT Revisions • Autumn 2004 • Customer Comments • Winter 2005 • Final OATT/FERC Filing • Spring 2005 • OATT Effective

  9. OASIS • wesTTrans Common OASIS • PPIW/WestConnect+ Joint Effort • Powered by OATI • Single Transmission Market Interface for the Western Interconnection. • 19 Transmission Providers • http://www.westtrans.net

  10. Transmission Business Unit • DSWR OATT Management • Requests for OATT Transmission Service • Firm Point-to-Point • Non-Firm Point-to-Point • Network Integration • Requests for OATT Interconnection Service • Large Generator • Small Generator • Transmission Line • Ancillary Services

  11. Transmission Business Unit • TBU Contacts • John Delgado • (602) 352-2660 • delgado@wapa.gov • Paul Dux • (602) 252-2784 • pdux@wapa.gov • Nancy Whitson • (602) 352-2667 • nwhitson@wapa.gov

  12. Contact Information • For more information, please contact: • Ron Moulton • (602) 352-2668 • moulton@wapa.gov • Tony Montoya • (602) 352-2780 • tmontoya@wapa.gov