This report summarizes the accelerator operations from October 3 to October 10, 2011, during Calendar Week #40. It includes weekly integrated intensity metrics for NuMI (7.59E18 protons), BNB (5.25E18 protons), and MTest (8.08E13 protons), along with recorded downtime of 69.52 hours. Key completed work and plans encompass proton source repairs, LRF1&2 tank vacuum leak repairs, BRF8 cavity removal, and ongoing safety system tests. Updates on Pbar production, and issues regarding cryo-compressors are also addressed.
E N D
All Experimenters’ Meeting October 10, 2011
Accelerator Operation Summary From : October 03, 2011 (0000 hours) To: October 10, 2011 (0000 hours) Calendar Week # 40 NuMI Weekly Integrated Intensity 7.59E18 protons BNB Weekly Integrated Intensity 5.25e18 protons MTest Weekly Integrated Intensity 8.08e13 protons Recorded Downtime 69.52 hours
Status /Work Completed/Plans • Proton Source • LRF1&2 tank vacuum leak repaired. • LRF5 PA replacement • Removal of BRF8 cavity. • PA replacement on 3 BRF stations • Booster Safety system tests • Main Injector • ANU pre-shutdown jobs. • Safety system tests . • $23 ramp length changed on Thursday • 2.06 Second Rep rate in MI • Pbar • Terminated final Pbars on Friday Oct. 7 @ 1117. • Valved out EQ923 due to LCW leak. • NuMI • Target moved to LE10 • MiniBooNE • MI12 AC unit will be installed when it arrives. • MTA • Investigating breaker trips affecting cryo-compressors