NRG Contribution to LEADER WP1.1 Status. LEADER Petten, Netherlands Ferry Roelofs roelofs@nrg.eu. Contents. Introduction Roadmaps v3 Guinevere MYRRHA ALFRED PROLFR ELFR LEADER Overview LFR Deployment Conclusions. Introduction Roadmap visualisation. Purpose
E N D
NRG Contribution to LEADER WP1.1Status • LEADER • Petten, Netherlands • Ferry Roelofs • roelofs@nrg.eu
Contents • Introduction • Roadmaps v3 • Guinevere • MYRRHA • ALFRED • PROLFR • ELFR • LEADER Overview • LFR Deployment • Conclusions Petten • 2 November 2011
IntroductionRoadmap visualisation • Purpose • Provide overview of timing of main developments • In addition • Identification of critical path • Identification of costly developments • Identification of developments with high risk • Approach • Roadmapper Workbench Excel based tool from Albright Strategy Group • Limited level of detail to enable keeping an overview • Outcome • Roadmap visuals which can be used in presentations to (potential) stakeholders and which are easy to update during and after the project Petten • 2 November 2011
IntroductionRoadmaps under Consideration • It was agreed with WP1 and WP1.1 coordinators to include roadmaps for: • LFR Zero Power GUINEVERE (LFR/ADS) • LFR ETPP MYRRHA (LFR/ADS) • LFR E&T ELECTRA (LFR) • LFR ETDR ALFRED (LFR) • LFR Prototype PROLFR (LFR) • LFR FOAK ELFR (LFR) Petten • 2 November 2011
IntroductionRoadmap Construction • Three levels • Level 1 • Main roadmap elements (e.g. reactor, fuels, materials) • Level 2 • Secondary roadmap elements / subdivisions of main roadmap elements, e.g. fuel qualification, fuel fabrication • Level 3 • Individual developments / subdivisions of secondary roadmap elements, e.g. fuel irradiation, fuel safety tests Petten • 2 November 2011
IntroductionInput Data • Input data • Begin time • End time / duration • Cost estimate (range) • Risk (low / medium / high) • Initial guess provided by NRG based on information from SNE-TP, ESNII, EUROTRANS, MYRRHA, EISOFAR Fuel Roadmap, ELSY and LEADER projects • Data review by LEADER experts to be identified this meeting • Continuous update during the LEADER project Petten • 2 November 2011
IntroductionItems for Discussion • Confirmation/identification of main and secondary roadmap elements • Confirmation/identification of individual developments • Input data content review Petten • 2 November 2011
RoadmapsGUINEVERE Petten • 2 November 2011
RoadmapMYRRHA Petten • 2 November 2011
RoadmapALFRED Petten • 2 November 2011
RoadmapPROLFR Petten • 2 November 2011
RoadmapELFR Petten • 2 November 2011
RoadmapLFR Deployment • Adapted according to D29 rev1.1 october 2011 • Including a schedule for ELECTRA Petten • 2 November 2011
The End “Thanks for your attention” Petten • 2 November 2011