NRG Contribution to LEADER WP1.1 Status

NRG Contribution to LEADER WP1.1 Status. LEADER Petten, Netherlands Ferry Roelofs roelofs@nrg.eu. Contents. Introduction Roadmaps v3 Guinevere MYRRHA ALFRED PROLFR ELFR LEADER Overview LFR Deployment Conclusions. Introduction Roadmap visualisation. Purpose

trudy
Télécharger la présentation

NRG Contribution to LEADER WP1.1 Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NRG Contribution to LEADER WP1.1Status • LEADER • Petten, Netherlands • Ferry Roelofs • roelofs@nrg.eu

  2. Contents • Introduction • Roadmaps v3 • Guinevere • MYRRHA • ALFRED • PROLFR • ELFR • LEADER Overview • LFR Deployment • Conclusions Petten • 2 November 2011

  3. IntroductionRoadmap visualisation • Purpose • Provide overview of timing of main developments • In addition • Identification of critical path • Identification of costly developments • Identification of developments with high risk • Approach • Roadmapper Workbench Excel based tool from Albright Strategy Group • Limited level of detail to enable keeping an overview • Outcome • Roadmap visuals which can be used in presentations to (potential) stakeholders and which are easy to update during and after the project Petten • 2 November 2011

  4. IntroductionRoadmaps under Consideration • It was agreed with WP1 and WP1.1 coordinators to include roadmaps for: • LFR Zero Power GUINEVERE (LFR/ADS) • LFR ETPP MYRRHA (LFR/ADS) • LFR E&T ELECTRA (LFR) • LFR ETDR ALFRED (LFR) • LFR Prototype PROLFR (LFR) • LFR FOAK ELFR (LFR) Petten • 2 November 2011

  5. IntroductionRoadmap Construction • Three levels • Level 1 • Main roadmap elements (e.g. reactor, fuels, materials) • Level 2 • Secondary roadmap elements / subdivisions of main roadmap elements, e.g. fuel qualification, fuel fabrication • Level 3 • Individual developments / subdivisions of secondary roadmap elements, e.g. fuel irradiation, fuel safety tests Petten • 2 November 2011

  6. IntroductionInput Data • Input data • Begin time • End time / duration • Cost estimate (range) • Risk (low / medium / high) • Initial guess provided by NRG based on information from SNE-TP, ESNII, EUROTRANS, MYRRHA, EISOFAR Fuel Roadmap, ELSY and LEADER projects • Data review by LEADER experts to be identified this meeting • Continuous update during the LEADER project Petten • 2 November 2011

  7. IntroductionItems for Discussion • Confirmation/identification of main and secondary roadmap elements • Confirmation/identification of individual developments • Input data content review Petten • 2 November 2011

  8. RoadmapsGUINEVERE Petten • 2 November 2011

  9. RoadmapMYRRHA Petten • 2 November 2011

  10. RoadmapALFRED Petten • 2 November 2011

  11. RoadmapPROLFR Petten • 2 November 2011

  12. RoadmapELFR Petten • 2 November 2011

  13. RoadmapLFR Deployment • Adapted according to D29 rev1.1 october 2011 • Including a schedule for ELECTRA Petten • 2 November 2011

  14. The End “Thanks for your attention” Petten • 2 November 2011