1 / 27

Prevention of BSI and VAP Measuring Change in Outcomes Part I

NNIS Surveillance Data. Central line-associated BSI rate5.0/1000 central line-daysVentilator-associated pneumonia rate5.8/1000 ventilator-daysThe numerator is the number of eventsNumber of patients with infection or pneumoniaThe denominator is the number of central-line or ventilator days, sta

trumble
Télécharger la présentation

Prevention of BSI and VAP Measuring Change in Outcomes Part I

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Prevention of BSI and VAP Measuring Change in Outcomes Part I Ted Speroff, PhD

    2. NNIS Surveillance Data Central line-associated BSI rate 5.0/1000 central line-days Ventilator-associated pneumonia rate 5.8/1000 ventilator-days The numerator is the number of events Number of patients with infection or pneumonia The denominator is the number of central-line or ventilator days, standardized to 1,000 Census data in the ICU, all patients with lines or on ventilator NNIS rate is calculated as number of BSI or VAP events (numerator) divided by observed number of line or vent days for the ICU (denominator) times 1,000

    3. Characteristics of NNIS Rate Data Requires aggregating data over a large sample Takes time to accumulate data Appropriate for Surveillance or Quality assurance Appropriate for detecting a rate increase Not appropriate for detecting a rate decrease unless sample is huge Insufficient for Quality Improvement

    4. Statistical Process Control Charts Used in QI to detect improvement (did it work?) Chart:

    5. BSI Rates and Control Chart Excel Tool Naming and Saving the File Entering Baseline Data Setting the Baseline Period for the Control Chart Editing Chart and Printing

    7. Name and Save the File Save Often

    8. Rename the Template File

    9. HCAHospitalName_ICUName_ ICUSafety_MonYr

    10. Spreadsheet is now called Music City_MICU_ICUSafety_Sep06

    11. Note the Tabs at the Bottom: 4 Worksheets BSI NNIS Rate VAP NNIS Rate

    12. BSI NNIS Rate

    13. First Entry: Month/Year 10/2004

    14. First Entry: CVC Days

    15. Collecting CVC Days

    16. First Entry: CVC-BSI Infections

    17. Continue Data Entry

    18. Data for Baseline Period Have Been Entered Note: Data + Chart

    19. Set Baseline Period: Move Cursor to Cell F20

    20. Baseline goes from row 20 to 34 Edit $D$50 to $D$34

    21. Move Cursor to Cell G3 Edit the Text

    22. Text is a Reminder to You of the Baseline Period: the data for mean and control limits

    23. Chart: To Edit Title Move Cursor on Title and Click

    24. Edit to your Hospital Name and ICU Name

    25. Continue Data Entry: Only Baseline Data determine Mean and Control Limits

    26. Data Complete through 6/2006 What do you see?

    28. End of Part I Questions and Comments so far? Continue to Part II