1 / 7

New Mexico Regulatory Context

New Mexico Regulatory Context. Jason Marks Commissioner, NM PRC May 21, 2010. Southwest Renewable Energy Transmission Conference. Wind projects in NM or serving NM. Utility-Scale Solar Projects in N.M. El Paso Electric/eSolar 92 MW CSP mini-tower

tudor
Télécharger la présentation

New Mexico Regulatory Context

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New Mexico Regulatory Context Jason Marks Commissioner, NM PRC May 21, 2010 Southwest Renewable Energy Transmission Conference

  2. Wind projects in NM or serving NM

  3. Utility-Scale Solar Projects in N.M. • El Paso Electric/eSolar 92 MW CSP mini-tower • TriState/FirstSolar 30 MW PV in Colfax County • Kit Carson 1 MW DG/ 1MW CPV • SPS/Sun Edison 5 x 10 MW PV (pending PRC approval) • PNM/FirstSolar 22 MW Dist. PV • TriState/DOE Solar preheat demo at Escalante

  4. Supporting Distributed Generation:customer-owned PV incentive programs

  5. New Mexico Renewable Energy Act: NMSA § 62-16-1A Renewable Portfolio Standard (RPS) Law • R.E.: solar, wind, biomass, geothermal • Scope: IOUs, Co-ops (lower requirement) • RPS 5% of retail sales in 2006 10% of retail sales in 2011 15% in 2015, 20% in 2020 • Reasonable Cost Thresholds • Annual Procurement Plans • Resource Diversity Rules: 20% Solar 1.5% - 3% Distributed Generation

  6. NM: Aggressive Targets / Small State

  7. NMPRC: Weak Jurisdiction over Transmission • NMSA § 62-9-3, Location Control • Approval required for gen. plants >= 300 MW • Approval required for 230 kV and above transmission lines “constructed in connection with and to transmit electricity from a new plant for which approval is required” • Not unduly impair important environmental values • For line w/ jurisdiction, PRC can overrule local gov’t on all questions of siting, land use, aesthetics and any other state or local reqmts. • Six month clock

More Related