1 / 19

Implementation of RIS in Flanders 2008-BE-30000-P

The European Union's TEN-T programme supporting …. Implementation of RIS in Flanders 2008-BE-30000-P. This project is co-funded by the European Commission. Implementation of RIS in Flanders. Introduction. Demonstration of the project results. Activity 1: Inland ENC’s

tyme
Télécharger la présentation

Implementation of RIS in Flanders 2008-BE-30000-P

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The European Union's TEN-T programme supporting … Implementation of RIS in Flanders 2008-BE-30000-P This project is co-funded by the European Commission

  2. Implementation of RIS in Flanders

  3. Introduction

  4. Demonstration of the project results • Activity 1: InlandENC’s • Status: Class IV+ are availablefor free on the portal http://nts.flaris.be • Activity 2: Logisticspiloton Albert Canal • Status: finished • Demonstration: http://possrv.flaris.be/logpil/

  5. Demonstration of the project results • Activities 3 & 4: Notices to Skippers (study and implementation) • Status: finished and operational • Demonstration: http://nts.flaris.be • Activity 5: StudyTracking & Tracing • Status: finished and reports available

  6. Demonstration of the project results • Activity 6: AIS – pilot • Status: 2 base stations alreadyinstalled: Olen en Vilvoorde (operational in Octoberbecause of safetyreasons) • 2 other base stations willbeinstalled in Evergem and Hasselt. • Demonstration: http://possrv.flaris.be/geoserver/mapPreview.do • picture

  7. Demonstration of the project results • Activity 7: VTS Wintam • Status: finished and operational • Demonstration: • Radar installation: picture • Radar client: picture • AIS-webclient: http://vtsweb.wenz.local

  8. Demonstration of the project results • Activity 8: WLAN • Status: will start soon. No tender, because of global contract. • Activity 9: FlaRIS I • Status: willbe in operation in Q1 2011 • Demonstration: http://risserver.flaris.be

  9. Demonstration of the project results • Activity 10: FlaRIS II – invoice software • Status: willbe in operation 1st of April 2011 • Activity 14: C@LRIS • Status: Finished, first test run in October 2010 • Demonstration: http://wenz.calris.flaris.be

  10. impression C@LRIS

  11. Demonstration of the project results • Activity 15: Equipment m/s Ilse • Status: finished and in use • Activity 16: Design and realisation RIS centreEvergem • Status: finished and in use

  12. Pictures

  13. Demonstration of the project results • Activity 19: Use of ERI messages in Port of Ghent • Status: finished and in use • Activity 20: data exchange between the port of Ghent and ArcelorMittal • Status: finished and in use

  14. Demonstration of the project results • Activity 22: Communication Activities • Status: on going • Demonstration: portal site http://ris.vlaanderen.be • Demonstration: publications AIS special, Inland ECDIS special. • Demonstration: AIS survey 2010 http://www.binnenvaart.be/documents/ResultatenAISenqueteEng.pdf + Helpdesk function taken up by PBV on daily basis.

  15. AIS pilot realisation

  16. Radar installation VTS-Wintam

  17. Radar client VTS Wintam

More Related