Waterford 3 Meteorological Monitoring Program Assessment

Waterford 3 Meteorological Monitoring Program Assessment. WF3 Meteorological Monitoring Program Assessment. What is the health of the meteorological monitoring program at WF3? What should a meteorological monitoring program at a nuclear power facility consist of?

tysonh
Télécharger la présentation

Waterford 3 Meteorological Monitoring Program Assessment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Waterford 3 Meteorological Monitoring Program Assessment Gregory Hood

  2. WF3 Meteorological Monitoring Program Assessment • What is the health of the meteorological monitoring program at WF3? • What should a meteorological monitoring program at a nuclear power facility consist of? • At WF3, are we doing enough? Are we doing too much? Gregory Hood

  3. Unique situation at WF3 • Frequently subpoenaed for our meteorological data. • Many chemical plants and refineries are located in the vicinity • Dupont, Shell, Oxidental, Dow, & more. • We can be supplying data for either plaintiffs or defendants. • Sometimes data is requested directly from a law firm (no subpoena). Gregory Hood

  4. Environmental Engineer / Specialist WF3 Responsibilities • Met data validation and QC. • Annual met program report. • Dispersion & deposition factors • Many non-meteorological duties: • NPDES permitting & reporting • Air Permitting & reporting • Hazardous waste & Industrial Waste • Environmental reviews and evaluations • etc., etc. Gregory Hood

  5. Waterford 3 Meteorological Monitoring Program Assessment Gregory Hood

  6. Assessment Questions • More NRC scrutiny of REMP locations sited with meteorological considerations • Is the environmental specialist devoting enough time to the meteorological monitoring program? Gregory Hood

  7. Assessment Process at WF3 & Entergy Nuclear – South • Yearly, assessment topics are submitted to site and corporate assessment groups • This year was time for the meteorological monitoring program • important to me because of subpoenas • Important to my boss because he got a subpoena when I was out of town Gregory Hood

  8. General Issues • Nuclear industry trend, reduce costs • Staffing levels have gone down. • The meteorological monitoring program may not be getting the detailed technical assessments managers think is occurring by the routine QA audits and NRC inspections. Gregory Hood

  9. Waterford 3 Meteorological Monitoring Program Assessment Gregory Hood

  10. Audit scope: • The assessment should include a check of compliance with current procedures and requirements • Additionally, we wanted a critical look at the entire program • Is everything that should be getting done, being done? • QA audits and NRC inspections can give false sense of security • No problems or deficiencies are thought to exist. Gregory Hood

  11. WF3’s Meteorological monitoring program. • 1985 to 1991, WF3 did not collect digital met data. • Data was transformed into digital data by sending strip charts to a vendor. • Strip charts were sent in every 4 weeks. • Problems in the data/strip charts would frequently cause large periods of data loss. • Corrective actions recommended by the vendor lagged far behind when the problems appeared. Gregory Hood

  12. WF3 project to provide on-site digital data • First program (1991): • Writing one minute met data to a 9-track tape off of the Plant Monitoring Computer (PMC). • The tape was given to Health Physics Department and read into a database on an RS/6000. • A software program was run that calculated and created hourly averaged met data records. Gregory Hood

  13. Waterford 3 Meteorological Monitoring Program Assessment Gregory Hood

  14. WF3 project to provide on-site digital data (cont’d) • Finally, the best set of parameters to use was created consisting of the bare basic necessities: • 10m WS • 10m WD • delta-temp • This was sufficient data to determine X/Q & D/Q information. Gregory Hood

  15. Meteorological Tower Instrumentation Upgrade (P 1) • The current Climatronics/Campbell Scientific system was installed in 1995 • CR-10 & solid state data storage • Still 4-20 ma analog output to plant • The metdata software was re-written to run under windows using Visual Basic and an Access database. Gregory Hood

  16. Meteorological Tower Instrumentation Upgrade (P 1) • Towers now determined 15 minute and hourly averaged data. • The strip chart recorders were eliminated and replaced with solid state data storage modules. • This basic metdata software is still being used, today. Gregory Hood

  17. Waterford 3 Meteorological Monitoring Program Assessment Gregory Hood

  18. Meteorological Tower Instrumentation Upgrade (P 2) • 1996 • the data stream from the tower was converted to digital • the PMC was upgraded including implementation of the PI plant data archiving system. • This provided additional data useful in the analysis of met data. • The PI database can be utilized to obtain met data should data be lost from the solid state data storage modules. Gregory Hood

  19. WF3 Re-organization • October 1996 • Health Physics transferred effluent and environmental monitoring programs and some personnel (including the met monitoring program) to Chemistry Department. • One on-site person has been primarily involved in dealing with meteorological data since 1989. Gregory Hood

  20. Building a High Quality Assessment • Need a pollution meteorologist on the team. • Entergy technicians and specialists don’t have as much expertise • Little exposure to other meteorological monitoring programs • Will base much upon how their site program is run. • Mgmt suggested we find two meteorologists from different companies to be on the assessment team. Gregory Hood

  21. Waterford 3 Meteorological Monitoring Program Assessment Gregory Hood

  22. Building a High Quality Assessment (cont’d) • Thanks to NUMUG, I had a starting point to help me find meteorologists • Due to time crunch, I limited searching for meteorologists to those I was aware of on a short list from the last NUMUG meeting that I attended • Two meteorologists on the team presented some difficulty in keeping costs down • This impacted their time available on-site Gregory Hood

  23. Assessment Scope: • Wanted it to cover just about all of the major aspects of the program. • Reviewed guidance documents and references • Also was familiar with the “hard” questions to ask. • 16 Objectives in the Assessment Planning Worksheet Gregory Hood

  24. Assessment Report • Guidelines for the content of assessment report provided to the meteorologist team members • Each meteorologist to supply an assessment report • Information from other team members sent to team leader • Used in the creation of the final site assessment report Gregory Hood

  25. Waterford 3 Meteorological Monitoring Program Assessment Gregory Hood

  26. Assessment Outcome/Results • As a result of the limited personnel involvement in the care and upkeep of meteorological data, some elements of the program, such as written procedures, have not been fully developed. • Waterford-3 is doing a lot to ensure that our met data is of good quality. Gregory Hood

  27. Assessment Outcome/Results (cont’d) • There are weak areas that can be strengthened to make it an excellent program. • Site management is pleased with the assessment effort. • The train is on the tracks, but the rails could be tightened up a bit. • WF3’s meteorological data has been maintained largely through the efforts of one individual with no spending allocated. • more resources will need to be put into maintaining meteorological data. Gregory Hood

  28. Recommendations • Include the Meteorological Monitoring Program in your site’s self-assessment plan or schedule • Get a professional pollution meteorologist or two on the team • Give the team sufficient time on-site to cover your defined scope Gregory Hood

  29. Finally… • Expect WF3’s Meteorological Monitoring Program to be the best in the Entergy Nuclear – South fleet. • Expect other ENS plants to look toward WF3, for the model meteorological monitoring program Gregory Hood

  30. Waterford 3 Meteorological Monitoring Program Assessment Gregory Hood