Lineman Rodeo Demonstration. May 22, 2010. Pole Top Rescue. Lineman in trouble is discovered Worker calls for assistance from truck Puts on climbing gear Climbs pole for rescue. Pole Top Rescue. Lineman secures his own safety Then works on the unhooking and lowering of the other worker

ura
Télécharger la présentation

Lineman Rodeo Demonstration

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lineman Rodeo Demonstration May 22, 2010

  2. Pole Top Rescue Lineman in trouble is discovered Worker calls for assistance from truck Puts on climbing gear Climbs pole for rescue

  3. Pole Top Rescue Lineman secures his own safety Then works on the unhooking and lowering of the other worker Once on ground, rescuer will perform CPR until emergency personnel arrives

  4. Cross Arm Change-out First there is a discussion of the job to be done Then the first worker climbs the pole and secures his safety. The second lineman then can climb up

  5. Cross Arm Change-out Now that both workers are on the pole, they can work together to change the cross arm

  6. Cross Arm Change-out Once the cross arm has been removed, it can be lowered to the ground. The ground crew will change out the arm and a new one will be raised to be attached

  7. Cross Arm Change-out Once the arm is reattached, the lines are reattached Now the job is done and the linemen can climb down.

  8. Cherie BerryCommissioner of Labor Talking to the spectators about the linemen, their training, and the apprenticeship program

  9. Live Line Demonstration This demonstration was done in two parts: at low voltage and high voltage Demonstrations were done to show the wide variety of items that can be conductors when they interact with live lines

  10. Live Line Demonstration • Items tested: • Tree • Kite String • Mylar balloon • Ladder • Fireman’s boot • Lineman’s boot • Rubber Glove They also showed what occurred when the typically proper shoes and gloves were damaged. When those have holes, they are going to be conductors, just like anything else.

  11. Pole Mounted Transformer Change When a transformer needs to be changed, a lineman will climb up and start preparing the transformer for removal

  12. Pole Mounted Transformer Change The truck operator will be bringing the transformer down with the crane once the lineman has attached it to the crane and removed it from the pole.

  13. Pole Mounted Transformer Change Once the transformer is on the ground, it is removed and a new one is attached. It is brought back up to the lineman for reconnection. Once the transformer is reconnected, the lineman will climb down.

  14. Thank you all for viewing the photos from the 2010 Lineman Rodeo Demonstration If you have any questions about the event or about apprenticeship, please call (919) 733-7533