An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VistA Internationalization Project Group—Phase 1 End By Sam Habiel, PharmD Presenter Peter Li November 13th, 2018

  2. Happenings Last Week (1/2) • All code merged into plan-vi branches • https://github.com/OSEHRA-Sandbox/VistA/tree/plan-vi • https://github.com/OSEHRA-Sandbox/VistA-M/tree/plan-vi • VEHU repo now has a plan-vi branch • https://github.com/OSEHRA-Sandbox/VistA-VEHU-M/tree/plan-vi

  3. Happenings Last Week (2/2) • %DT routine now handles inexact dates in yyyy/mm format (thanks to G Timson) • New Docker Image: VEHU6 • VEHU with i18n code changes • https://hub.docker.com/r/osehra/vehu6/ • Compiled CPRS Code/Vitals dll • https://github.com/OSEHRA-Sandbox/VistA/releases/tag/cprs31a-utf8-c

  4. VEHU6 Screenshots

  5. VEHU6 Screenshots

  6. VEHU6 Screenshots

  7. VEHU6 Screenshots

  8. VEHU6 Screenshots

  9. Summary of Phase 1 • CPRS Read/Write to VistA Unicode Data • CPRS Localization Strategy and Framework • CPRS display of correct date format depending on Windows Locale

  10. Phase 2 Plan • Phase 2 is M infrastructure i18n • Will involve more proper changes to some of the M code changed in Phase 1

  11. Phase 2 Objectives • Move non-portable code in XWBRW to Kernel (use of $ZL, $ZE). • Fix XLFNAME code to allow non-US names • Localize Data in Fileman (e.g. Cover sheet headers) • Localize Menu System • Localize a simple workflow in Outpatient Pharmacy • Put in Korean Lexicon and test with CPRS

  12. Schedule

  13. Personal Schedule over next 2 weeks • Peter will present this week (Nov 13) • Off week after (Nov 20) • Sam back Nov 27