An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Framing Walls Mr. Johanson Technology Education Blue Mountain High School

  2. Objectives • Parts of a wall • Plate Layout • Story Pole • Constructing wall sections • Erecting wall sections • Double top plate • Wall sheathing • House wrap

  3. Terminology • Cripple Studs • A stud used above or below a wall opening. Extends from the header to the top plate or from sole plate to rough sill, Also called a jack stud. • Headers • Horizontal structural member that supports the load over an opening, such as a window or door. Also called the lintel

  4. Terminology • House wrap • Plastic sheets used to seal exterior walls against air infiltration • Master Stud Pattern • Similar to a story pole, but has information marked on it for only a portion of the wall • Partition • A wall that subdivides space within and story of a building

  5. Terminology • Rough opening • An opening formed by framing members to receive and support windows or doors • Sheathing • Boards or prefabricated panels that are attached to the exterior studding or rafters of a structures • Soffit • The underside of the members of a building, such as staircases, cornices, beams, and arches. Relatively small in size as compared with ceilings.

  6. Terminology • Sole Plates • The lowest horizontal strip in wall and partition framing. The sole plate is supported by a wood subfloor, concrete slab, or another closed surface • Story pole • A strip of wood used to lay out and transfer measurements for door and window opening, siding, and shingle courses, and stairways

  7. Terminology • Studs • One of a series of vertical structural members in walls and partitions • Top plates • Wall forming members used in conventional platform construction • Trimmers • The beam or floor joist into which a header is framed; adds strength to the side fo the opening

  8. Parts of a wall

  9. Parts of a wall • Studs • Made with either 2 x 4 or 2 x 6 • Spaced 16” O.C. but 24” O.C. is not unheard of • Common heights in the east are 8’ • Studs travel from floor to ceiling uninterupted

  10. Parts of a wall • Trimmer stud • Shortened studs that serve to stiffen up rough openings • Bear direct weight of header • Carpenters normally install trimmers so that all tops are same height, allowing for all to be cut at one time

  11. Parts of a wall • Top plate • Located under the double top plate • Serves as top of wall • Double top plate • Serves to strengthen wall • Over lap at wall intersections and wall breaks to create added strength

  12. Parts of a wall • Header • Structural member above a rough opening • Bears building load for opening • Built with thicker materials for strength, the larger the opening the bigger the material need

  13. Headers

  14. Parts of a wall • Rough sill • Serves as the bottom of a window opening • Cripple studs • Shortened studs that serve to carry loads around doors and windows from sole plate to rough sill or header to top plate

  15. Parts of a wall • Sole plate • Bottom part of wall • Gets nailed directly to the subfloor or concrete floor

  16. Wall parts terminology • King stud • Stud directly next to header • Run full length of wall • Serves to help support opening and give nailing surface to framing members and rough opening components

  17. Wall parts terminology confusion • Jack studs • I was always taught that jack studs were the studs directly next to the king stud as shown here in this picture • However the book calls the cripples jack studs • Like with many areas of construction terms, codes, and general practices vary with region

  18. Building corners • There are two basic ways to frame a corner out • Regardless of which method you choose realize the point is create strength and give a solid nailing surface for interior finishing.

  19. Building Corners

  20. Wall intersetions • These work similarly to corners, the main goal is create a strong intersection yet allowing for proper nailing surface.

  21. Wall intersections

  22. Story poles • What are story poles? • It is a long measuring stick made up by the carpenter on the job • It marks the height for all horizontal members • Story poles are not widely used or often used, there use seems to be limited and considered more of an ancient technique

  23. Assembling wall sections • Wall sections should be assembled on the floor • Starting with any rough openings can help make framing faster • Caution should be taken when using a nail gun • Safety glasses and gloves should be worn to protect yourself from misfires.

  24. Assembling wall sections • Bracing should be attached to the wall before walls are raised • Bracing includes: Sheathing, metal supports or wood supports cut into the studs • In the north east almost all homes have sheathing on them • Check for wall square while the wall in on the ground before attaching sheathing.

  25. Raising wall sections • Before raising walls ensure you have the following completed • Have bracing for holding walls in place • For raising exterior wall sections place blocking to help keep wall sections from sliding off the subfloor • When raising walls by hand splitting walls in sections can help to reduce allow more manageable pieces

  26. Raising wall sections • For larger jobs with larger wall sections cranes and heavy equipment can be used to aid in the process • Once the wall is in place the wall must be plumbed • Some racking of the wall section may be necessary to get the wall into plumb • Ensuring the wall was square prior to placing sheathing will aid in this process

  27. Double top plate • The double top plate is used for reinforcing the wall sections • Any walls split into sections must be reinforced with the double top plate by lapping the joint by at least 4 feet with the double top plate

  28. Sheathing • House sheathing is typically done in either plywood or OSB • Regardless of which one is used make sure it is structural grade • When placing on walls before being raised keep in mind that this will add significant weight to the wall • All wall sheathing should be installed before any roofing is completed

  29. House Wrap • House wrap prevents air movement into or out of a building • This wrap is intended to cover cracks and wall joints where air could possibly infiltrate the house • Common trade names for house wrap is Tyvek and Typar • House wrap also waterproofs the walls keeping water from entering the house from the outside but allowing moisture from the inside out • This property is called Vapor Permeability

  30. Special Framing Situations • When framing around plumbing cuts need to be made to accommodate pipes

  31. Special Framing Situations

  32. Special Framing Situations

  33. Special Framing Situations