An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI

  2. High-radiation area Design parameters and layout of the Super-FRS

  3. Participating institutes in task7 (NUSTAR2)

  4. Multi-annual implementation plan for NUSTAR2

  5. Material properties: Exploration of radiation load on magnets behind the high-power production target • 3 different aspects of energy deposition • Quench limit (2-3mJ/g): close to limit • Material life time (see table): mineral insulation required • Cooling requirements (expected FAIR cryogenic power: 20 kW): economic operation not possible • Decision • Normal conducting magnets with mineral insulated cable (MIC) Energy deposition distribution (calculated with PHITS) Projectile: 1500 MeV/u 238U 1012/s σx = 1.0 mm σy = 2.0 mm σp /p = 0.5% Target: Carbon 4 g/cm2 • Average energy deposition on on the coil surface:<ΔE>/M ≈ 1 mJ/g • Equivalent to 14 MGy/a (4000h/a operation ) • Heat load on the cryogenic system for a 5 ton quadrupole magnet: ≈ 2.3 kW Material properties:

  6. Mineral insulated cable (MIC) • Potential suppliers • Hitachi, Japan • Kirscable, Russia • Tyco Thermal Controls, Canada • Copper conductor with and w/o cooling channel • Rated up to 3000 A (engineering current density 3-6 A/mm2) • Expected cable costs ≈150€/m

  7. Magnets with MIC • New technology for GSI -> investigation of feasibility for all magnets potentially to be build with MIC • 11° dipole (3 units) • Quadrupole with 10cm aperture radius (2 units) • Quadrupole with 20cm aperture radius (1 units) • Sextupole (2 units) • Conceptual designs for all magnets were prepared (additional collaboration work with P.Vobly (BINP) is appreciated) • Direct cooling vs. indirect cooling was investigated • Indirect cooling is favorable • Cooling circuit and electrical circuit are separated -> no copper corrosion in the high radiation field • Engineering current density is higher • Conductor end plugs easier to be made • Separation of water and current terminals to one end of the magnet, each • Parameters of cooling circuit are independently from electrical circuit • Use of one conductor cross section for all magnets probable

  8. Example: Quadrupole with 10cm aperture radius • Indirectly cooled • Cable 14x14mm • Copper cross section 9x9mm • Current 1100A • 170kW • Directly cooled • Cable 19.8x19.8mm • Copper cross section 14.5x14.5mm • Cooling channel 7.3x7.3mm • Current 1900A • 240kW Sizes are comparable!

  9. Half yoke weight: 43 tons Example: Dipole • Indirectly cooled • Laminated magnet • Pole shims for improved field quality • Bent magnet under investigation Cooling terminals Electrical terminals

  10. Example: Sextupole • Indirectly cooled • Laminated magnet

  11. Surveying and alignment system for high-radiation areas • Remote-controlled camera vehicle in tunnel or on working platform • Eccentric photogrammetric targets on magnets • Sequential photogrammetric survey of inaccessible areas during shutdown • Bundle adjustment of photogrammetric network • Determination of correction values for magnet positions • Automatic, remote-controlled adjustment of machine geometry

  12. Surveying and alignment system for high-radiation areas Work packages • Development of basic concept (photogrammetric solution) • Evaluation of camera specs; geometric camera tests • Design of algorithms for image analysis • Simulations of potential camera configurations • Camera tests at radioactive environments • Evaluation of constraints for accelerator design • Evaluation of criteria for automatic remote adjustment • Concept for integration in accelerator operation Most of the work packages ( ) are still in process since planning of accelerator design is not finished yet