170 likes | 301 Vues
Team Paradigm has made significant strides in the Discrete Cosine Transform project. Key achievements include completing the design and architecture proposals, alongside gate-level design and component simulations. The project has focused on maintaining speed while reducing size, achieving a chip layout completion of 90%. Notable milestones such as DRC and LVS checks for component layouts are finalized. The revised transistor count stands at 31,484 with a density/porosity of 0.155. The team looks forward to addressing any concluding questions as we progress to the next phase.
E N D
:: Milestone 82-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping Zhan M2: Team Paradigm
Team Paradigm M2: Team Paradigm
Design Goals Project Status • Still Speed but also • Reduction of size • Design Proposal (Done) • Architecture Proposal (Done) • Gate level Design(Done) • Component Layout (DRC & LVS): (Done) • Component Simulation: (Done) • Component Layout (Done) • Component Simulation (Done) • Chip Layout (90%) • TBD • Chip Layout (Finished) • Spice Simulation of Entire Chip M2: Team Paradigm 18-525, Integrated Circuits Design Project
Masks for 1-D M2: Team Paradigm
Poly Top M2: Team Paradigm
Poly Bottom M2: Team Paradigm
M1 Top M2: Team Paradigm
M1 Bottom M2: Team Paradigm
M2 Top M2: Team Paradigm
M2 Bottom M2: Team Paradigm
M3 Top M2: Team Paradigm
M3 Bottom M2: Team Paradigm
M4 Top M2: Team Paradigm
M4 Bottom M2: Team Paradigm
1ddct M2: Team Paradigm
2DDCT • 450 by 450 • Sorry yesterdays transistor count was only for the DCTs • Revised Transistor Count: 31484 Transistors • Density/Porosity: 0.155 M2: Team Paradigm
::conclusion & questions M2: Team Paradigm