First Trip Analysis

First Trip Analysis. Chugach Electric. Presented by: Steven Cannon, Substation Lineman. Chugach Overview. Alaska’s largest electrical utility Provides generation, transmission, and distribution services Generation mix 90% gas, 10% hydro 65,000 members. Chugach System. 230kv-12.4kv lines

vina
Télécharger la présentation

First Trip Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. First Trip Analysis Chugach Electric Presented by: Steven Cannon, Substation Lineman

  2. Chugach Overview • Alaska’s largest electrical utility • Provides generation, transmission, and distribution services • Generation mix 90% gas, 10% hydro • 65,000 members

  3. Chugach System • 230kv-12.4kv lines • 50 substations and switchyards • 87 power transformers • 323 circuit breakers

  4. Alaskan Rail Belt • The Alaska Railbelt system • Electrically Islanded • The Railbelt system • 850 MW Peak • Four generation areas: Fairbanks, Anchorage, Beluga, and the Kenai Peninsula. • The Anchorage area • Anchorage and Beluga generation • Tied to both the Fairbanks and Kenai Peninsula systems through single transmission ties • 138 kV tie north to Fairbanks • 115 kV tie south to the Kenai.

  5. Why First Trip Analysis? • Analyze breakers “in the field” condition

  6. Lubrication • Grease is composed of soap and oil • Oil provides lubrication • Soap gives consistency to hold lubrication • Oil eventually separates from the soap • Time causes soap to harden and gum up • Harden soap slows down breakers

  7. Advantages of Capturing First Trip • Breaker can be tested in energized state • Test can be performed in about 10 minutes • Overlay breaker operations

  8. Qualifications for Operator • Know how to read breaker control schemes • Be qualified to switch • Be computer literate • Understand safety rules for working in a substation

  9. Connections

  10. latch Trip Coil Plunger

  11. Interpreting Graphs

  12. Breaker 1616

  13. Breaker 1616 DC Prints CC Amp Probe DC (+) DC (-) TC Amp Probe

  14. DC Leads CT Leads

  15. Main Bearings

  16. Latch Bearing

  17. Breaker 1616 Results

  18. Important Tips • Change batteries often • Come to the breaker prepared • Label wires to apply leads • Catch the first trip • Catch multiple breaker operations • Save each shot before moving the Profile • Periodically upload shots to computer • Develop a backup plan