1 / 23

Total Drilling Cost

Total Drilling Cost. AC BHMT's Value Proposition Prepared for: Indiana Society of Mining and Reclamation 19 th Annual Technolocy Transfer Seminar Dec. 5 th & 6 th , 2005. What is "value"?. The AC BHMT "value proposition" is based on drill productivity , not "bit life".

vina
Télécharger la présentation

Total Drilling Cost

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Total Drilling Cost AC BHMT's Value Proposition Prepared for:Indiana Society of Mining and Reclamation19th Annual Technolocy Transfer SeminarDec. 5th & 6th, 2005

  2. What is "value"? • The AC BHMT "value proposition" is based on drill productivity, not "bit life". • “Drill productivity” costs a mining company much more than "bit life". • Let's take a few minutes to talk about and understand what YOUR value proposition is based on. • Then we will explain ours.

  3. Total Drilling Cost Total Drilling Cost is a value concept that places its' emphasis on the cost of drill productivity. Progressive customers understand and adopt the philosophy that the cost of productivity drives the economics of a mine. Total Drilling Cost captures and shows the cost of drill productivity.

  4. The Total Cost of Drilling • TDC includes everything it takes to run a drill: • Labor • Power: fuel or electricity • Drilling tools and supplies • Maintenance labor & parts • Supervision, administration • Cost of equipment ownership (lease, purchase, or rental payments) With all things considered, drill operating costs can exceed US$300 per operating hour. $ $ $ $

  5. Total Drilling Cost Method 1 TDC = (Bit Price / Meters Drilled) + (Drill Operating Cost per Hour / ROP)

  6. Total Drilling Cost • Example #1: • Bit cost = US$5,000 • Bit life, meters = 6,500 • Penetration Rate = 52 meters/hour • Rig Cost = US$200 per hour

  7. Total Drilling Cost Example #1: TDC = Bit Life + Productivity ($5,000 / 6,500m) + ($200 / 52 m/hr) = $0.77 / meter + $3.84 / meter = $4.61/meter

  8. Total Drilling Cost • Example #2: • Bit cost = US$5,000 • Bit life, meters = 8,000 • Penetration Rate = 40 meters/hour • Rig Cost = US$200 per hour • TDC = (Bit Cost / Bit Life) + (Rig Cost / Pen Rate)

  9. Total Drilling Cost • Example #2: TDC = ($5,000 / 8,000 m.) + ($200 / 40 m/hr) = $.625 + $5.00 = $5.63 / meter

  10. Total Drilling Cost Example #2 TDC = ($0.63 / m.) + ($5.00 / m.) = $5.63 / meter $1.02 MORE! for a bit that is less productive but has longer life?! (52 vs. 40 m/hr., 8,000 vs. 6,500 m) Where is the advantage really found?

  11. Total Drilling Cost TDC Method 2 TDC = (Bit Price / Meters Drilled) + Fixed Cost + (Variable Cost / Rate of Penetration) Where: • Fixed Cost = Annual Overhead Cost / Annual Meter Budget • Variable Cost = Labor + Fuel + Supervision + Repair Parts + Repair Maintenance + Repair Labor

  12. TDC Method 2 Fixed Cost Calculation: • For example: $1.50/meter fixed cost $1.50 / meter = $900,000 overhead cost for drill fleet / 600,000 annual budget meters • Ownership cost of the drill fleet (lease, rent, purchase payments) • Drill Maintence budget for fleet (PM parts, fluids, normal wear parts, etc.) • Budgeted drilled meters.

  13. TDC Method 2 Example A: • Bit cost = US$5,000 • Bit life, meters = 6,500 • Penetration Rate = 52 meters/hour • Fixed Cost = $1.50 / meter • Variable Cost = $95 / hour TDC = ($5,000 / 6500) + $1.50 + ($95 / 52) TDC = $.77 + $1.50 + $1.83 = $4.10

  14. TDC Method 2 Example B: • Bit cost = US$5,000 • Bit life, meters = 8,000 • Penetration Rate = 40 meters/hour • Fixed Cost = $1.50 / meter • Variable Cost = $95 / hour TDC = ($5,000 / 8000) + $1.50 + ($95 / 40) TDC = $.63 + $1.50 + $2.38 = $4.51 $.41 / meter MORE for every meter drilled!($246,000 per year based on 600,000 m drilled/yr)

  15. Production Cost Only What is the cost of producing a single blasthole? • Cost = Drill Cost per Hour x Time spent drilling, hrs • $$ = $150 per hour x 30 minutes • $$ = 150 x .5 • $$ = $75 per hole drilled • $$ = $150 per hour x 20 minutes • $$ = $150 x .33 • $$ = $50 per hole drilled • Productivity costs less!

  16. Total Drilling Cost • With Total Drilling Cost calculated by any method, the productivity (ROP) and drill cost are the “drivers” of the calculation. • Bit Price per Meter is a small part of theTDC. • Ex. 1, bit price/m, $.77 is 17% of $4.61/m. • Ex. 2, bit price/m, $.63 is 11% of $5.63/m. • Ex. A, bit price/m = 19%, FC + VC = 81% • Ex B, bit price/m = 14%, FC + VC = 86%

  17. Total Drilling Cost

  18. Total Drilling Cost • The cost of productivity is the largest part of TDC • Spend less time drilling each hole. • Choose faster drilling bits. • Run bits to give high Penetration Rate and reasonable bit life. • This will keep the TDC low.

  19. Results Western USA Copper Mining Company Total Drill Cost (TDC) 2.40 2.00 1.60 BHMT US Dollars 1.20 Manuf #2 0.80 Manuf #3 0.40 0 01/01/2002 thru 12/31/2002 1/01/2003 thru 12/31/2003 01/01/2004 thru 12/31/2004 01/01/2005 thru 12/31/2005 11/15/2005

  20. Results • Western USA Copper Mining Cost Savings: • 2003 vs. 2002: $ -84,735 $1.89/ft • 2004 vs. 2003: $ 837,561 $1.65/ft • 2005 vs. 2004: $ 228,637 $1.58/ft • Total savings year on year: $981,463 • If no change in TDC: • Would have spent: $22,921,117 (at $1.86/ft, 2002) • Actually spent: $21,254,869 • Saved: $ 1,666,248

  21. Canadian Coal Miner Total Drill Cost (TDC) 10.00 8.00 6.00 BHMT US Dollars 4.00 2.00 0 01/01/2002 thru 12/31/2002 01/01/2003 thru 12/31/2003 01/01/2004 thru 12/31/2004 01/01/2005 thru 12/31/2005 11/15/2005 Results

  22. Results • Canadian Coal Miner Operating Cost Savings: • 2003 vs. 2002: $1,235,237 $7.58/m • 2004 vs. 2003: $ 520,781 $6.30/m • 2005 vs. 2004: $ 120,268 $5.85/m • Total savings year on year: $1,876,286 • If no change in TDC: • Would have spent: $13,888,389 (at $9.91/meter, 2002) • Actually spent: $10,101,431 • Saved: $ 3,786,958

  23. Thank You! • Questions??

More Related