1 / 9

Progress of NVDAL BSL-3 Construction

Progress of NVDAL BSL-3 Construction. Enuh R.Djusa DVM,Ph.D. Jl.Raya Pembangunan, Gn. Sindur Bogor 16340. BACKGROUND. HPAI is still problem in southeast Asia countries including Indonesia Vaccination is one of the strategy implemented beside Other strategies

Télécharger la présentation

Progress of NVDAL BSL-3 Construction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress of NVDAL BSL-3 Construction Enuh R.Djusa DVM,Ph.D. Jl.Raya Pembangunan, Gn. Sindur Bogor 16340

  2. BACKGROUND • HPAI is still problem in southeast Asia countries including Indonesia • Vaccination is one of the strategy implemented beside Other strategies • NVDAL ensures the quality of the vaccines distributed in Indonesia. • BSL-3 is urgently needed to test zoonotic diseases vaccines such as AI,Rabies,Brucella, Anthrax, and others.

  3. References Internasional Standard: • WHO Laboratory Biosafety Manual, 3rd edition 2004 (accessed online 2010)3 • OIE Manual of Diagnostic Tests and Vaccines for Terrestrial Animals (2008): Chapter 1.1.2: Biosafety and Biosecurity in the Veterinary Microbiological Laboratory and Animal Facilities (accessed online 2010)

  4. BSL-3 Construction Phase • Conceptual design • Review process • Detailed design • Review process • Tender preparation • Approval • Call for tender • Tender evaluation and award • Construction and supervision (site inspections and meetings) • Contractual and payment support • Commissioning and testing • Selection and appointment of certifier • Certification • Hand-over • Cold and training operation • Hot operation • Post-commissioning observation (warranty issues)

  5. Location of BSL-3 in NVDAL BSL-3 size : 15 x 24 sq.m.

  6. BSL 3 Lay out BSL-3 lay out

  7. Room Arrangement • BSL-3 laboratory equipped by BSC class IIA2, refrigerator, freezer, CO2 incubator, centrifuges etc. • Cabinet Laboratory-style ABSL-4: isolators (animal isolators and surgical isolator).

  8. Corridor: connected all laboratories, changing room for male/female, Equipment maintenance (autoclave, dunk-tank, pass-box, Storage room. • Decontamination airlock for heavy equipment transfer. • Administration room

  9. TERIMA KASIH

More Related