1 / 10

Presentation to PACA Briefing for Industry 18 August 2010

Presentation to PACA Briefing for Industry 18 August 2010. CAPT Fred Beavers Chief of Staff 505-846-4379 fred.beavers@kirtland.af.mil. UNCLASSIFIED -APPROVED FOR PUBLIC RELEASE ORS10-35 8/5/10. CDR USSTRATCOM ORS End-State. Gaps / Needs Identified and Prioritized by USSTRATCOM.

vinson
Télécharger la présentation

Presentation to PACA Briefing for Industry 18 August 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presentation to PACA Briefing for Industry 18 August 2010 CAPT Fred Beavers Chief of Staff 505-846-4379 fred.beavers@kirtland.af.mil DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited UNCLASSIFIED -APPROVED FOR PUBLIC RELEASE ORS10-35 8/5/10

  2. CDR USSTRATCOM ORS End-State Gaps / Needs Identified and Prioritized by USSTRATCOM UNCLASSIFIED -APPROVED FOR PUBLIC RELEASE ORS10-35 8/5/10

  3. S&T Infusion ORS End-State Operating Concept JFC Needs ORS Office Concepts/Solutions Group Tier-1 Solutions Plug-and-Fight spacecraft components– MOSA standards Tier-2/3 Mission Design Tool Govt s/w Library Tier-2/-3 Solutions ISR Mission Kit Comms Mission Kit Rapid Transport to Launch Range Space Protection Mission Kit Innovation Cell Rapid Integration & Launch Tactical Tasking & Downlink Modular Open System Architecture (MOSA) Responsive C2 & TPED Responsive Buses & Payloads Responsive Range & Launch UNCLASSIFIED -APPROVED FOR PUBLIC RELEASE ORS10-35 8/5/10

  4. State of ORS Today • ORS end-state architecture being developed based on overarching guidance (QDR, NSP, DPPG, ORS CONOPS, etc.) • TacSat-3 operational on orbit, providing evidence of military utility of a low-cost hyperspectral sensor, and ability of small satellites to enable rapid technology refresh. • ORS-1 on track for FY11 launch to provide proof of lower-cost, shorter-timeline business model and evidence of tactical utility. • TacSat-4 on track for FY11 launch; will demonstrate UHF comms and FFT mission capabilities. • RRSW contract awarded. MSV contract in source selection. • ORS Office PC/FM support contract awarded, SETA contract in source selection. ORS Office Budget (FY11 PB) FY11 $94M FY12 $88M FY13 $78M FY14 $54M FY15 $126M FY16 $128M UNCLASSIFIED -APPROVED FOR PUBLIC RELEASE ORS10-35 8/5/10

  5. ORS Office Organization DOD EA for Space CDRUSSTRATCOM Authorities Requirements Director Dr. Peter Wegner, USAF FFRDC /UARC Consortium Technical Director Dr. Bob McCoy, USN Deputy Director LTC Glover, USA Chief of Staff CAPT Beavers, USN Plans & Programs CDR Geiger, USN Tier-1: Employ LtCol Terselic, USMC Tier-2: Deploy Lt Col Henderson, USAF Tier-3: Develop Dr. Jeffry Welsh, USAF Operations LTC Carroll, USA Government: USAF, USA,USN, USMC • Liaisons: • NRO, NSA, NGA, NASA • FFRDC/UARC: • Aerospace, MITRE, APL • SETA Support: • 20+ UNCLASSIFIED -APPROVED FOR PUBLIC RELEASE ORS10-35 8/5/10

  6. ORS Omnibus BAA • Acquisition plan currently being developed. • Anticipate multiple calls/proposals over 5 years. • Allows for multiple needs to be filled as they arise and funding available. • Enables responsive procurement actions when funding is available and specific needs are identified.   • Potential Broad Topic Area #1: Employ (ORS Tier-1 Focus) • Use existing assets to meet warfighter needs within minutes to hours • For example, use of current commercial and international satellites • Potential Broad Topic Area #2: Develop (ORS Tier-3 Focus) • Rapidly develop technologies and transition to the warfighter within months • Launch, range, spacecraft, payloads, ground systems, etc. • Anticipate release in FY11. Once announced, will encourage open discussion with industry and submission of white papers on broad topics and/or specific needs. • POC: Frank (Jay) Strub, 505-853-2838 UNCLASSIFIED -APPROVED FOR PUBLIC RELEASE ORS10-35 8/5/10

  7. SBIR Program • We expect 2-3 directly controlled SBIR topics per year in FY11 and beyond. • In the 9.3 SBIR cycle we had 3 topics and made 10 Phase I awards. Phase II awards are not yet finalized. • Also, the ORS Office will likely have influence on some AFRL SBIR topics. In the 9.3 SBIR cycle, AFRL/RV awarded 12 Phase I SBIR contracts of relevance to ORS. • POC: Dr. Jeff Welsh, Tier-3 Division Chief 505-846-7344 jeffry.welsh@kirtland.af.mil UNCLASSIFIED -APPROVED FOR PUBLIC RELEASE ORS10-35 8/5/10

  8. Recent ORS SBIR Topics UNCLASSIFIED -APPROVED FOR PUBLIC RELEASE ORS10-35 8/5/10

  9. Recent AFRL/RV SBIR Topics with Relevance to ORS UNCLASSIFIED -APPROVED FOR PUBLIC RELEASE ORS10-35 8/5/10

  10. Questions? UNCLASSIFIED -APPROVED FOR PUBLIC RELEASE ORS10-35 8/5/10

More Related