1 / 16

FP7-Infra-2011-2.1.1 : Design studies for European Research Infrastrutures

“Gliders for Research, Ocean Observation and Management” General Assembly. FP7-Infra-2011-2.1.1 : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month 18 – month 39)

vivan
Télécharger la présentation

FP7-Infra-2011-2.1.1 : Design studies for European Research Infrastrutures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. “Gliders for Research, Ocean Observation and Management”General Assembly FP7-Infra-2011-2.1.1 : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month 18 – month 39) Grant Agreement No: 284321 ; Total budget : 3,5 M€ http://www.groom-fp7.eu 19 partners from cy, de, fr, gr, it, no, es, uk

  2. WP1 Project Scientific and Technological coordinationUPMC and all partners

  3. WP1 Objectives • Ensure the coordination of the project on scientific and technological aspects in conformity with the objectives, methods and quality standards described in the contract (task 1.1) • Internal and external communication (task 1.2)

  4. Objectives related to task 1.1 • Scientific coordination and monitoring of work-packages • The supervision of project progress milestones and project global direction • Organize project meetings and internal reviews • The scientific review of the work performed by the partners including scientific deliverables • Research risk management • The preparation of the scientific part of the reports to be submitted to the EC

  5. Work progress task 1.1 • 1st General assembly: Kick-off meeting in Nov. 2011 in Paris • 4 formal Steering Committee meetings • Several informal SC meeting during WPs workshops • 1st periodic scientific report (delayed end June 2013) • Risk - contingency action registry established • End of 1st reporting period, March 2013. First report accepted by the EC • 2nd General Assembly, Trieste, 04-05/06/13 • 4 formal Steering Committee meetings • EGO/GROOM meeting, Kiel, • Grant period extension required • Detailed review for 4 key deliverables. Still to be done for D5.1 and the final report

  6. Work progress task 1.2 • GROOM website • Paper in MERCATOR-CORIOLIS Newsletter, April 2012, “Towards a global glider infrastructure for the benefit of marine research and operational oceanography” • Paper in "International Innovation": Helping marine science reach new depths (Oct. 2012) • Editorial in "Sea Technology Magazine": Gliders Evolving to Enhance Ocean Observation (Dec. 2012) • Special session at EGU2013 chaired by EGO/GROOM • Ocean Business 2013, Southampton, 09-11/04/13 • GROOM at JCOMM-OCG, Silver Spring, USA, 05-07/09/13 • GROOM at Workshop on Arctic and Marine Research Infrastructures, Rome, 17/09/2013 • GROOM at EuroGOOS, Brussels, 20/11/13 • Special session "Autonomous platforms" at OSM co-chaired by GROOM, 23-28/02/14 • GROOM at OI'14, London, 11-13/03/14

  7. Work progress task 1.2 • GROOM at 2nd ICRI, Athens, 02-04/04/14 • EGO/GROOM at COST Conference in Sopot, Poland, “The predictive power of marine sciences in a chaging climate” • GROOM at "Landscape of the European Research Infrastructures for Environmental Sciences", Paris, 22/05/14 • PLOCAN Glider School, Las Palmas, 14-19/07/14 • GROOM at 6th IEEE/OES Baltic Symposium, Tallinn, 26/05/14 • Glider demonstration and capacity building in Algeria, Sidi Fredj, 12-16/05/14 • EGO/GROOM final meeting, Kiel, 16-17/06/14 • and many others …  STRONG REMINDER: Fill "Dissemination activities" page on Vitamib

  8. Work progress task 1.2: Brochure and "Gliderport booklet" • Extensive distribution of the brochure by the coordinator (OI'14, ICRI, …) + pencils + T-shirts • And by the partners (!) • STRONG REMINDER to all to continue • Be reactive to Daniel and Jelto's solicitations for the booklet

  9. Work progress task 1.2: OI'14 • 9m2 Booth. Animation by UEA, SAMS, UPMC/CNRS, … • 2 (nice) GROOM videos displayed. Can be downloaded from GROOM website for further use • More than 150 GROOM contacts with tracking. Several contacts with students and young people • Participation to 2 OI'14 workshops with Oil&Gas stakeholders

  10. GROOM main achievements • Description of the present infrastructure (hardware, personnel, running costs,…) • Survey on possible sensors to implement on gliders for Research, Ocean Observation & Management • New infrastructure components developed and tested (operations, calibration, visualization, risk analysis, mission planning piloting,…) • Definition of the desired levels of European integration

  11. GROOM main achievements • Outreach (Web sites, training, young audience) • International coordination (USA, AUS, EU and others) • Setup an international community of (best) practice • A first common data format was issued in the 3 main poles of glider activity (EU, USA and AUS). •  Gliders as a component of the GOOS such as the Argo profiling floats, the OceanSites moorings…

  12. GROOM main achievements • Gliders will certainly be included in the next ESFRI roadmap • Numerous scientific papers and communications related to GROOM • STRONG REMINDER: Fill "Dissemination activities" page on Vitamib Not finished yet (3 months extension) • Organize the internal and external review of last deliverables now. • Final Scientific Report before 28/02/2015

  13. The next steps for gliders… • Continue GROOM participation to next ESFRI roadmap  2016 EU calls • Concretize relation between EGO/GROOM and EuroGOOS • BRIDGES Technological proposal for a deep glider submitted to BG6/H2020 led by GROOM • AtlantOS proposal submitted to BG6/H2020. Glider task led by CNRS • JERICO-Next proposal submitted to INFRAIA/H2020. TNA for gliders and technological task on sensors • ENVRI+ proposal submitted to INFRADEV/H2020. Small contribution of GROOM

  14. The Future… • For new or existing RIs, • The EU needs to pave the way towards an efficient research ‘ecosystem’ • Member States remain the key actors • Large facilities • Distribute European facilities • Regional Partner Facilities • Linked with EU and nationa programmes, universities & schools • Network of industrial suppliers/users • ’. Without the jont involvement of the scientific communities and the territorial developmentactors, the EU will not succeed in managing this (efficient) ‘ecos-system

  15. The Future… H2020 JERICO-Next ? ENVRI+? GROOM 2 ??? ERIC EuroArgo

  16. Advisory board • Merged Advisory (scientific) Board and Policy Maker Board • Two step consultation : 3 experts at the GA and review process for the final scientific report and executive summary by all ~~~~~ • GROOM @ EuroGOOS : • Which institutional support from EuroGOOS ? • Which kind of concrete actions can be conducted to exploit EGO/GROOM momentum ? • GROOM @ FIXO3 : • Concretize potential GROOM input to WP11 "Optimization of ocean observing capability" ? • Which kind of concrete actions can be conducted to exploit EGO/GROOM momentum ? • GROOM @ EuroArgo and ESFRI : • Which concrete work with the EuroARGO ERIC ? • Present ESFRI trend toward a large Marine RI.

More Related