SlideServe
Menu
Préférences
© SlideServe · v2026

Solving Concurrent Work Problems in Algebra 1 and Honors

vivi avatar
9 diapositives · 232 Views · Sep 22, 2014

This document covers concurrent work problems in Algebra 1 and Algebra 1 Honors, demonstrating how to calculate the time required for multiple individuals to complete a job together. Key examples include Shelly and Kenny mowing a yard, Wendy and Bebe building a clubhouse, and Butters and Pip shoveling snow. Students will learn to determine individual work rates and apply them to find combined efforts. Real-world applications and step-by-step solutions provide a clear understanding of these concepts.

Solving Concurrent Work Problems in Algebra 1 and Honors - slide 1
01 / 9Solving Concurrent Work Problems in Algebra 1 and Honors
1 / 17

Télécharger la présentation

Solving Concurrent Work Problems in Algebra 1 and Honors
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Concurrent Work Problems Algebra 1 & Algebra 1 Honors

  2. t = time together a = first individuals time b = second individuals time 1 = the entire job

  3. If Shelly can mow the yard in 3 hours and Kenny’s brother can mow the yard in 2 hours, how long will it take if they mow the lawn together ?

  4. Wendy can build a clubhouse in 3 hours and Bebe can build a clubhouse in 4 hours, how long will it take if they build one clubhouse together?

  5. Shoveling Snow After a heavy snowfall, Butters can shovel all of the driveway in 30 minutes. If Pip helps, the job takes only 20 minutes. How long would it take Pip to do the job by himself?

  6. Shoveling Snow After a heavy snowfall, Butters can shovel all of the driveway in 30 minutes. If Pip helps, the job takes only 20 minutes. How long would it take Pip to do the job by himself?

  7. Conclusions • Pip’s rate was 60. • If Pip shoveled the drive way by himself it would take 60 minutes or 1 Hour.

  8. Work & Motion Word Problems Algebra 1