380 likes | 499 Vues
This document provides an in-depth overview of the Deutsche Gesellschaft zum Bau und Betrieb von Endlagern für Abfallstoffe mbH (DBE) and its role in planning, constructing, and operating federal repositories for radioactive waste. It highlights key sites, including the Konrad repository, Gorleben site exploration, and Morsleben repository, detailing geological models, underground facilities, and operational milestones. It emphasizes the regulatory framework and collaborative shareholders involved in these crucial projects aimed at ensuring safe disposal of radioactive materials.
E N D
Sites and Projects Headquarters of DBE and DBE TECHNOLOGY at Peine Site Exploration Mine at Gorleben Konrad Repository at Salzgitter Repository Morsleben at Morsleben Deutsche Gesellschaft zum Bau und Betrieb von Endlagern für Abfallstoffe mbH (DBE)
Regulatory Framework DBE plans,constructs and operates all Federal repositories for radioactive waste on behalf of BfS BfS is the responsible office of the Federal Government for repository construction and operation The Federal Government shall provide repositories for radioactive waste disposal (§ 9a, Abs. 3, Atomic Energy Act)
Shareholders GNS Gesellschaft für Nuklear-Service mbH, Essen (75%) Babcock Noell Nuklear GmbH, Würzburg (25%)
Milestones Konrad Repository Gorleben Site Exploration Mine Morsleben Repository
Gorleben – Geological Model EB 9 EB 7 EB 5 EB 3 EB 1
Gorleben – Underground Facilities • 7 km Drifts • 11 km Boreholes
Gorleben – Salt Dome Cross-Section EB 1 z2 z3 z2 z4 z4 z3 z1 Bornemann 1987
Gorleben - Geological Section EB1 z3 z3 HA z2 z3
Konrad – Underground Facilities Shaft 2 Shaft 2 • 40 km Drifts
Morsleben – Salt Deposit Quelle: BfS
Morsleben – Waste Disposal Eastern Field Central Area Eastern Field
Morsleben – Repository Mine with Central Area Zentralteil Backfilling Volume: • Central Area: 670.000 m³ • Bartensleben: 3,7 Mio m³ • Marie: 0,8 Mio m³
Pipe for monitoring cables Steel mesh with gauze Shotcrete reinforcement Gravel layer Drainage pipe Chamber Preparation