An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MISSION STATE MENT AND VISION MISSION STATEMENT To be among the best in the Energy Industry in providing properly engineered products and services to the sector for sustainable growth and profitability without compromising on issues of Safety, Health, Environment and Quality. OUR VISION To provide solutions to TOMORROW’S problems TODAY, through the application of appropriate technologies by our team of proficient engineers and craftsmen.

  2. CAPABILITIES C A P A B I L I T I E S • Design and construction of conical fixed roof storage tanks. • Design and construction of floating roof storage tanks. • Design and construction of Piping systems. • Installation of Fire Detection & Suppressing Systems. • Installation of floating suction on Aviation Fuel tanks • Design and construction of Loading Gantry, installation of Loading Arms, Meters and accessories • Sizing and installation of pumps • Civil works, which include design and construction of Tank Foundations, Buildings, Bund walls, Concrete Driveway for BRV Access, Gutters, Drainage systems, etc • Construction of Oil/Water Interceptor • Earthing and cathodic protection of Tanks, Lightning Arrestors & Masts • Design and construction of Electrical systems and panels. • Roof and Wall Insulation including HVAC Ductwork • Design, Fabrication & Installation of Structural Steel Framework for Buildings including warehouses • Concrete Sump Tank Construction • Steel Doors complete with Ironmongery (including but not limited to PANIC EXIT BARS, DOOR CLOSERS…) • Room partitioning walls complete with acoustic sandwich panels • Toilet Cubicles Installation • Raised Access floor panels procurement & Installation. • Provision of EPC Management of Complex contracts including the construction of mini oil refineries • Design and fabrication of an increasing number of Engineering components

  3. EQU I PMENT & FAC I L I T I ES AVA I LABLE EQUIPMENT & FACILITIES AVAILABLE Asaa Energy has, over time, acquired the basic equipment and facilities for smooth execution of her clients’ brief. Where the required equipment are not owed, such have usually been rented from equipment rental companies. Also the company has acquired the latest editions of the relevant codes, recommended practices, software and regulations to guide her design engineers in meeting the stringent design requirements of the Power, Oil & Gas Industry Asaa Energy Management team is made up of experienced and tested professionals is their various areas of specialization, from project management, Structural, Mechanical and Chemical Engineering, to Safety and Environmental Engineering. Our team has qualified and experienced inspectors and supervisors in Quality Assurance and Control measures that meet ISO 9001-2000 requirements, covering all our fabrication and installation activities. The company has developed well articulated SAFETY MANUAL and WORK PROCEDURES MANUAL for the regulation of the activities of ALL WORKERS. American Petroleum Institute (API) Recommended Practices in areas of interest American Welding Society (AWS) Recommended Practices in areas of interest American Society for Testing and Materials (ASTM) Standard Specifications in areas of interest British Codes of Practice and Standards in areas of interest Department of Petroleum Resources Regulations Electricity Regulation Council of Nigeria Publications Various Software for Pipeline Design, Pumps Design, Structural Steel Design, Electrical Design, etc, etc.

  4. CertificateofIncorporation CertificateofIncorporation

  5. Asaa Energy & Engineering Services Limited(RC: 164 091) was incorporated in 1991 as a limited liability company. • Core Business: • Engineering, Procurement, Installation and Commissioning in the Upstream and Downstream sectors of the Oil & Gas and Power Industries. • REGISTERED OFFICE • 79, Mushin Road, Isolo, Lagos • Tel: 234018444182 • Web Site : www.asaaenergy.com • OTHER OFFICES: • 27 Balarabe Musa Crescent • Victoria Island, Lagos. • Branch Office: 16, Choba St, D/Line, • Port-Harcourt • Tel/Fax 234-84-238823 • Director • Mr. NdudiEnenmoh • Director • Engr. AilemeUnuigbe • DIRECTORS OF THE COMPANY • Managing Director: • Engr. Cletus C. Duru • Engineering Director: • Engr. OducheAzih • Construction Services Director: • Engr. Boniface Egelamba • Director • Mr. NdudiEnenmoh • Director • Engr. AilemeUnuigbe • The Management comprises a team of competent professionals with several years of project experience in relevant EPC disciplines Asaa Energy & Engineering Services Limited

  6. TRACK RECORDS TRACK RECORDS YEAR PROJECT DESCRIPTION CLIENT LOCATION MAN-HRS 2,000 Continuation of Detailed Engineering Designs for Refinery off-Sites 2012 Iwopin, Ogun State Antonio Oil Plc Contract for the construction of 4 x 12,700,000 Liters white products storage tanks Ceecon Energy, Oil & Gas Limited IkotAbasi, Akwa Ibom State 6,000 Ascon Oil Company Limited Oghara, Delta State 1,000 Completion of Detailed Engineering Designs for a 45,000,000 liters Oil Terminal Rumuolumeni, Port Harcourt, Rivers State 3,000 Contract for Front End & Detailed Engineering Designs for a 107,000,000 liters Oil Terminal Liquid Bulk Limited TRACK RECORDS Contract for the construction of 4 x 8m Liters white products storage Tanks Diamond Pearls Petroleum Limited Iwopin, Ogun State 0 Contract for FEED and Detailed Engineering Designs for a 60,000,000 liters Oil Terminal Bakerfield Petroleum Limited Lekki, Lagos State 1,000 Oghara, Delta State 1,000 Transcon Energy Marketing Limited Contract for FEED and Detailed Engineering Designs for a 36,000,000 liters Oil Terminal Contract for FEED and Detailed Engineering Designs for a 28,000,000 liters Oil Terminal Xixco Oil Limited Oron, Akwa Ibom State 1,000 2010 Contract for complete brown field Depot upgrade comprising construction of an additional 5,000 MT capacity Storage tank, expansion of the Loading racks, Relocation of products pump house, demolition and rebuilding Of the BRV circulating area 20,000 Techno Oil Limited Kirikiri, Lagos

  7. YEAR PROJECT DESCRIPTION CLIENT LOCATION MAN-HRS Contract for the construction of 4 x 12,700,000 Liters white products storage tanks Ceecon Energy, Oil & Gas Limited IkotAbasi, Akwa Ibom State 2011 6,000 Contract for Front End & Detailed Engineering Designs for a 45,000,000 liters Oil Terminal Ascon Oil Company Limited Oghara, Delta State 2,000 Liquid Bulk Limited Rumuolumeni, Port Harcourt, Rivers State 2,000 Contract for Front End & Detailed Engineering Designs for a 107,000,000 liters Oil Terminal Contract for the construction of 4 x 8,000,000 Liters white products storage tanks Iwopin, Ogun State Diamond Pearls Petroleum Limited 1,000 TRACK RECORDS

  8. TRACK RECORDS CONTINUES TRACK RECORDS

  9. TRACK RECORDS

  10. TRACK RECORDS

  11. TRACK RECORDS

  12. TANK CONSTRUCT ION ACT IVI T IES PICTURE GALLERY (VERTICAL CYLINDRICAL TANKS CONSTRUCTION) • TANK CONSTRUCTION IS PRECEDED BY THE FOLLOWING CIVIL WORKS: • SITE CLEARING, SITE LAYOUT & SOIL INVESTIGATION • SOIL IMPROVEMENT WORKS TO UP-GRADE SOIL LOAD BEARING CAPACITY • PLACEMENT OF REINFORCED CONCRETE RING BEAM • PLACEMENT AND COMPACTION OF FILLING SAND TO LEVEL • LAYING OF DAMP PROOF COURSE (ASPHALTIC PAD) OVER COMPACTED SAND • CONSTRUCTION OF THE TANK CONSISTS IN THE FOLLOWING WORKS: • BLASTING AND COATING OF THE UNDERSIDE OF BOTTOM PLATES & LAYING • ERECTION OF SHELL PLATES ACCORDING TO BEST PRACTICES • WELDING OF BOTTOM & SHELL PLATES ACCORDING TO BEST PRACTICES • ERECTION & WELDING OF ROOF STRUCTURES & ROOF PLATES • INSTALATION OF SHELL AND ROOF NOZZLES • INSTALATION OF STAIRS AND HAND RAILS • NON DESTR. TESTS (X-RAY, MAGNETIC PARTICLE, VAC. BOX, HYDROSATAIC) • GRIT-BLASTING AND PAINTING AS REQUIRED

  13. TANK CONSTRUCT ION ACT IVI T IES Casting of Tank Base in progress After casting the wall of the Tank base, compaction of filling sand underway

  14. TANK CONSTRUCT ION ACT IVI T IES With 50mm thick hot-rolled asphalt, tank pad is Completed followed by the laying of Annular plates

  15. TANK CONSTRUCT ION ACT IVI T IES TANK CONSTRUCTION ACTIVITIES (CONTINUED) Erection of first shell course in progress Erection of other shell courses in progress

  16. TANK CONSTRUCT ION ACT IVI T IES Erection of other shell courses in progress A fully welded shell horizontal joint

  17. TANK CONSTRUCT ION ACT IVI T IES Staff, well kitted in their respective PPES await the next call to duty Steel plates for the tank construction are selected from known stamped sources

  18. TANK CONSTRUCT ION ACT IVI T IES A WELDING INSPECTOR ON DUTY AT IKOT ABASI A TECHNICIAN SQUARING STEEL PLATES AT IKOT ABASI

  19. TANK CONSTRUCT ION ACT IVI T IES Welding of the shell courses in progress: Note precautionary safety accessories outside and inside the tank being erected Some AsaaEnergy Senior Engineers During the Commissioning of the AsconOil Petroleum Products Depot At Ibru Port Complex in 2000

  20. COMPLETED FIREWATER TANK, AWAITING TESTING & PAINTING A 12 Million Liters PRODUCT TANK UNDER CONSTRUCTION

  21. TANK CONSTRUCTION ACTIVITIES A partial view of some Vertical Cylindrical Tanks installed for Sahara Energy Resources at The Ibru Port Complex in 2002 PAINTINSPECTIONACTIVITIES

  22. P I PEL I NE I NSTALLAT I ON ACT I V I T I ES PIPELINE INSTALLATION ACTIVITIES PIPELINE INSTALLATION ACTIVITIES

  23. P I PEL I NE I NSTALLAT I ON ACT I V I T I ES • Technicians executingpipelineinstallations including floatingsuction device in an aviation fuel tank

  24. Capabilities in the installing and commissioning a variety of equipment such as pumps, meters, foam systems, etc

  25. PICTURE GALLERY(SUMP TANK INSTALATION) SUMP TANK INSTALLATION INSERTS: (Water bar to the left and Anchor Bolts at the center), then Concrete placing

  26. PICTURE GALLERY(SUMP TANK INSTALATION) SUMP TANK INSTALATION Sump Tank after completion

  27. PILE CAP CONSTRUCTION PICTURE GALLERY(QUALITY CONTROL MEASURES) Concrete Slump test in progress Before and during concrete placing, the Surveyor keeps watch on levels

  28. QUALITY CONTROL MEASURES A 150mm concrete cube being weighed before crushing test Preparation of Concrete Cubes • Quality Control measures are taken for practically all of ASAA ENERGY’S Construction services covering, in the case of CIVIL WORKS, the following activities: • Physical analysis of reinforcement bars, anchor bolts, • Full characterization of sand, cement, granite and water for concrete works • Concrete cube tests after 7 and 28 days of curing • Random sampling and testing using Third Party Laboratories to confirm Manufacturers’ Mill Certificate claims

  29. PICTURE GALLERY(PILE CAP CONSTRUCTION) PILE CAP CONSTRUCTION Using a TOTAL STATION surveying Instrument, all anchor bolts are well aligned Thereafter, anchor bolts sleeves are carefully pulled out as soon as the concrete sets.

  30. PICTURE GALLERY(PILE CAP CONSTRUCTION) SUMP TANK INSTALATION Floor slab reinforcement is tied onto the pile cap reinforcement A template being tried out on anchor bolts

  31. PICTURE GALLERY(3-D IMPRESSION) LIQUID BULK DEPOT 3-D IMPRESSION 3-D IMPRESSION

  32. PICTURE GALLERY(3-D IMPRESSION) 3-D IMPRESSION