1 / 9

JH Weekly update

JH Weekly update. ALCT and TMB web pages were updated http://cmsdoc.cern.ch/cms/MUON/cscTrigger/html/CERN/ Would like to get pictures of “new” TMB board, better pics of ALCT boards Bad point in ALCT rx prediction? New predictions - AFEB fine delay corrections

weissf
Télécharger la présentation

JH Weekly update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JH Weekly update • ALCT and TMB web pages were updated • http://cmsdoc.cern.ch/cms/MUON/cscTrigger/html/CERN/ • Would like to get pictures of “new” TMB board, better pics of ALCT boards • Bad point in ALCT rx prediction? • New predictions - AFEB fine delay corrections • Time-of-flight corrections necessary • RMS (predicted delay – Dayong delay) is about 4 ns • Terentiev study of drift_delay based on raw hits is underway • 1.8v ALCT fuses blowing problem • ALCT fuses? 5A • Overvoltage  zeners draw current  fuses blow? • Bad zener diodes? • Idea from Korytov: TMBDMB bits to confirm the pretrigger? • Can it be done? • Do we want to do it? CSC Sync Taskforce Meeting hauser@physics.ucla.edu

  2. ALCT rx prediction • Works well based on formula on previous slide CSC Sync Taskforce Meeting hauser@physics.ucla.edu

  3. ME-2 x ME-3 I.P. YE-2 -Z Slice Test chambers used: ME-2/2/15 ME-2/2/16 ME-2/1/8 ME-2/2/17 ME-2/1/9 ME-2/2/18 ME-2/1/10 ME-2/2/19 ME-2/2/20 N.B. ME-2/1/9 offline ME-3: same set of chambers CSC Sync Taskforce Meeting hauser@physics.ucla.edu

  4. TOF delays, illustrated • Sideways (f-z) view: Cosmic rays come equally from both sides, so ME3-ME2 time differences cancel: dT ~ +5 ns dT ~ -5 ns ME-2/2/17 ME-3/2/17 YE2 steel But f=17 to f=18 time differences are significant: dT ~ +5 ns dT ~ +5 ns ME-2/2/18 ME-3/2/18 1.4 m CSC Sync Taskforce Meeting hauser@physics.ucla.edu

  5. Result of adding TOF corrections • (Added 25ns to time for ME-2/2/17 since +1 bx on mpc_tx_delay) • Time spread of MEx/2 is very small, much larger for MEx/1 small chambers CSC Sync Taskforce Meeting hauser@physics.ucla.edu

  6. Predictions of AFEB fine delays • Compare to Dayong values, taking into account: • Skewclear cable delay • TOF corrections • AFEB “flat-top” model • 480 AFEBs shown • Differences between predicted and actual setting: • RMS=2.0 bins, ~4.4 ns CSC Sync Taskforce Meeting hauser@physics.ucla.edu

  7. Predictions by chamber type • “Small” chambers, i.e. MEx/1: • Mean=-0.1 bins (-0.2 ns), RMS=2.4 bins (~4.8 ns) • 192 AFEBs • A large part of the RMS is chamber-to-chamber variations CSC Sync Taskforce Meeting hauser@physics.ucla.edu

  8. Predictions by chamber type • “Large” chambers, i.e. MEx/2: • Mean=0.0, RMS=1.64 bins (~3.6 ns) • 288 AFEBs • A large part of the RMS is chamber-to-chamber variations CSC Sync Taskforce Meeting hauser@physics.ucla.edu

  9. DMB timing parameters • Some DMB parameters never change, by construction • The ones that do need adjustment by chamber are: • cfeb_cable_delay • tmb_lct_cable_delay • cfeb_dav_cable_delay • alct_dav_cable_delay • *** Develop new plots and formulas here! CSC Sync Taskforce Meeting hauser@physics.ucla.edu

More Related