This guide outlines the demobilization process, including planning, organization, and resource release procedures. Learn how to identify limiting factors and communicate effectively during the demobilization phase to ensure a smooth and orderly transition. Explore the importance of demobilization plans and the information flow needed to request transportation for resource reassignment. Discover key elements such as surplus resources, tentative releases, and local reassignments. Get insights into potential demobilization problems and the resources available to assist during the process.

wilkersonm
Télécharger la présentation

Unit 10

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Unit 10 Slide 10-1

  2. Unit 10 Objectives • Identify basic elements of the demobilization process. • Identify conditions/situations which may limit resource availability for reassignment.

  3. Unit 10 Objectives • Describe the demobilization information flow in expanded dispatch, geographic area coordination center and the national level. • List the information required to place a request for demobilization transportation.

  4. Demobilization The safe and orderly removal of resources from the incident in a cost effective, efficient manner that requires coordination between the incident and expanded dispatch.

  5. Communication • Present a professional attitude and work ethic. • Work closely with each dispatch level, incident, area command, etc. • Help each other work together.

  6. Demobilization Plans • The planning section on the incident is responsible for making the demobilization plan. • The incident’s demobilization plan must follow national, area, and MAC demobilization plans.

  7. Demobilization Process • Planning at the incident • Demob Plan • Initial organization • Incident Action Plan (IAP) • Implementation at the incident • Surplus resources (checked against other orders) • Tentative release

  8. Expanded Level

  9. Reassignment and Availability • When tentative releases are received, reassignment and transportation need to be considered. • Identify conditions which may limit availability for reassignments.

  10. Reassign Locally • To the same or another incident • To a mobilization center • To a staging area

  11. Demobilization Resources/Transportation • Identify the process required to release resources

  12. Information Required to Place a Request for Transportation • Incident order and request number. • Number of people or pieces. • Manifest/Roster (information from check-in or demobilization unit). a. Names and Weights (personnel and baggage weighed separately). b. Flight Manager

  13. Information Required to Place a Request for Transportation 4. Date and time available at what pickup point. 5. Destination (both jetport and home unit location). 6. Support along the way (meals and lodging).

  14. Transportation Needs Local contacts: • Aircraft Dispatcher • Equipment/Transportation Dispatcher • Agency-designated travel agent Non-local contacts: • GACC to NICC for large aircraft

  15. Relay Travel Plans To: • Local ground transportation, equipment dispatch, or transportation dispatcher. • Local mobilization center or staging area. • Next coordination level.

  16. Potential Demob Problems • Examples: • Weather • Wrong or different request numbers • Wrong demob points • Passengers don’t show at assigned pick up point

  17. Resources that Help During Demobilization • Interagency Resource Representative (IARR) • Interagency Contract Representative • Cache Demobilization Specialist (CDSP)

  18. Resources that Help During Demobilization • Other Dispatch Offices (e.g., IA) • Demobilization Unit • Other aids: • ROSS • Isuite • T-cards • Other local examples may exist

  19. DemobSummary • Cancel outstanding orders • Finish all travel • Release all resources, etc.

  20. Unit 10 Objectives • Identify basic elements of the demobilization process. • Identify conditions/situations which may limit resource availability for reassignment.

  21. Unit 10 Objectives • Describe the demobilization information flow in expanded dispatch, geographic area coordination center and the national level. • List the information required to place a request for demobilization transportation.