winda
Uploaded by
33 SLIDES
733 VUES
370LIKES

Chapter 6-2 Multiplier

DESCRIPTION

Chapter 6-2 Multiplier. Multiplier Next Lecture Divider Floating Point Numbers. Multiplication of Positive Numbers using usual algorithm for multiplying integers. A lgorithm applies to unsigned numbers and to positive numbers

1 / 33

Download Presentation
Télécharger la présentation

Chapter 6-2 Multiplier

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 6-2Multiplier • Multiplier • Next Lecture • Divider • Floating Point Numbers

  2. Multiplication of Positive Numbersusing usual algorithm for multiplying integers • Algorithm applies to unsigned numbers and to positive numbers • Result of the product of two n-digit numbers can be accommodated in 2n digits • Binary multiplication of positive operands can be implemented in a purely combinational, two dimensional logic array 1 1 0 1 (13) Multiplicand M 1 0 1 1 (11) Multiplier Q Partial Products (143) Product P

  3. Formal Representation

  4. Multiplier Implementation Multiplicand m m m m 0 0 0 0 3 2 1 0 q 0 0 p 0 q 1 0 Multiplier p 1 q 2 0 p 2 q 3 0 p p p p p 7 6 5 4 3 Partial product (PP0) PP1 PP2 PP3 p , p , ... p PP4 = = Product 7 6 0 Bit of incoming partial product PPi m j q i Typical cell Carry-out Carry-in F A Bit of outgoing partial product PP(i+1)

  5. Array Multiplier m m m m q 3 2 1 0 0 q m m m m 1 3 2 1 0 HA FA FA HA q P m m m m 2 1 3 2 1 0 FA FA FA HA q m m 3 3 2 FA P P P P P 7 6 5 4 3 P 0 P m m 2 1 0 FA FA HA

  6. Ripple-Carry Array Multiplier 0 m q m q m q m q 3 0 2 0 1 0 0 0 m q m q m q m q 3 1 2 1 1 1 0 1 0 FA FA FA FA m q m q m q m q 3 2 2 2 1 2 0 2 0 FA FA FA FA m q m q m q m q 3 3 2 3 1 3 0 3 0 FA FA FA FA p p p p p p p p 7 6 5 4 3 2 1 0 • For the multiplication operation M  Q = P for 4-bit operands • M: m3m2m1m0 • Q: q3q2q1q0 • P: p7p6p5p4p3p2p1p0 • miqj =mi·qj

  7. The MxN Array MultiplierCritical Path HA FA FA HA Critical Path 1 FA FA FA HA Critical Path 2 Critical Path 1 & 2 FA FA FA HA Dmult=[(M-1)+(N-2)]Dcarry +(N-1)Dsum+1Dand

  8. Multiplier Implementation • The main component in each cell is an adder circuitry • Each AND gate determines whether a multiplicand bit mj is added to the incoming partial product bit, based on the value of the multiplier bit qj • For each row i ( 0 ≤ i ≤ 3) where qi = 1, adds the multiplicand appropriately shifted, to the incoming partial product, PPi, to generate PPi+1 • If qi = 0, PPi is passed vertically downward unchanged • PP0 is all 0s • PP4 is the desired product • The multiplicand is shifted left one position per row by the diagonal signal path

  9. Another Method of Multiplier Design • The previous algorithm may be impractical for large numbers because it uses many gates • Multiplication can be performed using a mixture of combinational array techniques and sequential techniques that require less combinational logic • In early computers, because of the cost of logic gates, the adder circuitry in the ALU was used to perform multiplication sequentially • Called sequential circuit binary multiplier

  10. Register A (initially 0) Shift right a a q q C n - 1 0 n - 1 0 Multiplier Q Add/Noadd control n -bit adder Control MUX sequencer 0 0 m m n - 1 0 Multiplicand M M 1 1 0 1 Initial configuration 0 0 0 0 0 1 0 1 1 C A Q 0 1 1 0 1 1 0 1 1 Add First cycle Shift 0 0 1 1 0 1 1 0 1 1 0 0 1 1 1 1 0 1 Add Second cycle Shift 0 1 0 0 1 1 1 1 0 No add 0 1 0 0 1 1 1 1 0 Third cycle Shift 0 0 1 0 0 1 1 1 1 1 0 0 0 1 1 1 1 1 Add Fourth cycle Shift 0 1 0 0 0 1 1 1 1 Product

  11. Sequential Circuit Binary Multiplier • This circuit performs multiplication by using a single adder n times to implement the spatial addition performed by the n rows of ripple carry adders • Registers A and Q combined hold PPi while multiplier bit qi generates the signal Add/Noadd • Add/Noadd controls the addition of the multiplicandM to PPi to generate PPi+1 • The product is computed in n cycles • The partial product grows in length 1 bit per cycle from the initial vector PP0 of n 0s in register A • The carry-out from the adder is stored in Flip-Flop C • At the start, the multiplier is loaded into register Q, the multiplicand into register M, and C as well as A are cleared to 0

  12. Sequential Circuit Binary Multiplier • At the end of each cycle, C, A and Q are shifted right by one bit position to allow for the growth of the partial product as the multiplier is shifted out of register Q • Because of this shifting, multiplier bit qi appears in the LSB position of Q to generate the Add/Noadd signal at the correct time, starting with q0 during the first cycle, q1 during the second cycle, etc... • If the adder has a delay of 10 ns • The control setting and the shift operations take another 10ns each • A hardwired multiply in a 32-bit word-length computer would take about 640ns • Multiply instructions took much longer to execute than Add instructions in early computers

  13. Signed Operand Multiplication • Multiplication of signed operands generates a double length product in the 2's complement number system • Consider the case of a positive multiplier and a negative multiplicand • When we add a negative multiplicand to a partial product, we must extend the sign bit value of the multiplicand to the left as far as the product will extend • The previous hardware can be used for negative multiplicands if it provides for sign extension of the partial products

  14. Sign Extension of Negative Multiplicand 1 0 0 1 1 ( - 13 ) ( ) ´ 0 1 0 1 1 + 11 1 1 1 1 1 1 0 0 1 1 1 1 1 1 1 0 0 1 1 Sign extension is 0 0 0 0 0 0 0 0 shown in blue 1 1 1 0 0 1 1 0 0 0 0 0 0 1 1 0 1 1 1 0 0 0 1 ( - 143 ) • Negative number must be the multiplicand and the positive number is the multiplier

  15. Booth Algorithm • A powerful algorithm for signed-number multiplication • treats positive and negative numbers uniformly • So far, the number of additions equals the number of 1s in the multiplier • Consider a multiplication in which the multiplier is positive and has a single block of 1s (e.g., 00111102 = 3010) • To derive the product, we could add four appropriately shifted versions of the multiplicand (i.e., for four 1s) • We can reduce the number of operations by regarding the multiplier as the difference between two numbers, i.e., 3210-210 or 01000002-00000102 • This suggests that the product can be generated by adding 25 times the multiplicand to the 2's complement of 21 times the multiplicand • The sequence of required operations can be recoded as 0+1000-10

  16. Booth Algorithm • -1 times the shifted multiplicand is selected when changing multiplier from 0 to 1 • +1 times the shifted multiplicand is selected when changing multiplier from 1 to 0 • The multiplier is scanned form right to left

  17. Normal and Booth Multiplication Schemes 0 1 0 1 1 0 1 0 0 + 1 + 1 + 1 + 1 0 0 0 0 0 0 0 0 0 1 0 1 1 0 1 Normal 0 1 0 1 1 0 1 0 1 0 1 1 0 1 0 1 0 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 1 0 0 0 1 1 0 0 1 0 1 1 0 1 + 1 - 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2's complement of 1 1 1 1 1 1 1 0 1 0 0 1 1 the multiplicand 0 0 0 0 0 0 0 0 0 0 0 0 Booth 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 1 0 1 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 1 0 0 0 1 1 0

  18. Booth Recoding of a Multiplier • When the least significant bit is 1 , assume an implied 0lies to its right 0 0 1 0 1 1 0 0 1 1 1 0 1 0 1 1 0 0 0 0 0 0 0 0 0 0 + 1 - 1 + 1 - 1 + 1 - 1 + 1 - 1 + 1 - 1

  19. Booth Multiplication with a Negative Multiplier 0 1 1 0 1 ( + 13 ) 0 1 1 0 1 1 1 0 1 0 0 - 1 +1 - 1 0 ´ ( - 6 ) 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 0 0 1 1 0 0 0 0 1 1 0 1 1 1 1 0 0 1 1 0 0 0 0 0 0 1 1 1 0 1 1 0 0 1 0 ( - 78 ) • Handles both positive and negative multipliers uniformly

  20. Correctness of Booth Technique for Negative Multipliers -2k+1 = X= • Let the leftmost zero of a negative number, X, be at bit position k • X = 11…10xk-1….x0 • The value of X is given by V(X)= -2k+1+xk-12k-1 +….+x020 • Example V(X) 11000 (-8) 11001 (-7) = -23 = -23 + 1 • For example, 1101102(-1010) is recoded as 0-1+10-10 -24+23-2 = -1010

  21. Booth Multiplier Recoding Scheme Multiplier Version of multiplicand selected by bit i i - Bit i Bit 1 0 0 0 ´ M 0 1 + 1 ´ M 1 0 1 ´ M  1 1 0 ´ M

  22. Booth Recoded Multipliers • Achieves some efficiency in the number of additions required when the multiplier has a few large blocks of 1s 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 Worst-case multiplier + 1 - 1 + 1 - 1 + 1 - 1 + 1 - 1 + 1 - 1 + 1 - 1 + 1 - 1 + 1 - 1 1 1 0 0 0 1 0 1 1 0 1 1 1 1 0 0 Ordinary multiplier 0 - 1 0 0 + 1 - 1 + 1 0 - 1 + 1 0 0 0 - 1 0 0 0 0 0 0 1 1 1 1 1 0 0 0 0 1 1 1 Good multiplier 0 0 0 + 1 0 0 0 0 - 1 0 0 0 + 1 0 0 - 1

  23. Fast Multiplication Bit-pair recoding of multipliers • Halves the maximum number of summands • Derived from the booth algorithm • (+1 -1) is equivalent to (0 +1) • Because (+1 -1) is (+102 + -12) = +2M + -M = +M = (0 +1) • Instead of adding +1×M at position i+1 to -1 times the multiplicand M at a shift position i • The same result can be obtained by adding +1×M at position i • (+1 0) is equivalent to (0 +2) • (-1 +1) is equivalent to (0 -1) • The booth-recoded multiplier is examined two bits at a time, starting from the right

  24. Multiplier Bit-Pair Recoding Multiplier bit-pair Multiplier bit on the right Multiplicand selected at position i i + 1  i i 1 0 0 0 0 ´ M 0 0 1 + 1 ´ M 0 1 0 + 1 ´ M 0 1 1 + 2 ´ M  1 0 0 2 ´ M  1 0 1 1 ´ M  1 1 0 1 ´ M 1 1 1 0 ´ M (b) Table of multiplicand selection decisions Sign extension Implied 0 to right of LSB 1 1 1 0 1 0 0 (a) Example of bit-pair recoding derived from Booth recoding   0 0 1 + 1 1 0   1 2 0

  25. MultiplicationRequiring onlyn/2 Summands Example 0 1 1 0 1 ( + 13 ) ´ 1 1 0 1 0 ( - 6 ) 0 1 1 0 1 0 - 1 + 1 - 1 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 0 0 1 1 0 0 0 0 1 1 0 1 1 1 1 0 0 1 1 0 0 0 0 0 0 1 1 1 0 1 1 0 0 1 0 ( - 78 ) 0 1 1 0 1 0 - 1 - 2 1 1 1 1 1 0 0 1 1 0 1 1 1 1 0 0 1 1 0 0 0 0 0 0 1 1 1 0 1 1 0 0 1 0

  26. Ripple-Carry Array Disadvantage • Multiplication requires many additions • Using Ripple-Carry Array is slow • Consider the addition of three n-bit numbers W, X,Y to produce the sum Z • We can first add W to X to generate a number A • Then we can add A to Y to produce Z • This can be done by using two ripple carry adders

  27. A Different Approach • Instead of adding W to X to produce A in the upper ripple carry adder, let’s introduce the bits of Y into the inputs • This generates the vectors S and the saved carries C as the outputs • In the second row, S and C are added in a a ripple carry adder to produce Z • Carry save addition can speedup this process

  28. Carry Save Array 0 m q m q m q m q 3 0 2 0 1 0 0 0 m q m q m q m q 3 1 2 1 1 1 0 1 m q m q m q m q 3 2 2 2 1 2 0 2 0 FA FA FA FA m q m q m q 0 m q 2 3 1 3 0 3 3 3 FA FA FA FA 0 FA FA FA FA p p p p p p p p 7 6 5 4 3 2 1 0 • For the multiplication operation M  Q = P for 4-bit operands • M: m3m2m1m0 • Q: q3q2q1q0 • P: p7p6p5p4p3p2p1p0 Q: Do you see any saving here?

  29. Example Ripple-Carry vs. Carry-Save

  30. Carry-Save Addition Approach (45) M 1 0 1 1 0 1 (63) Q 1 1 1 1 1 1 X A 1 0 1 1 0 1 B 1 0 1 1 0 1 C 1 0 1 1 0 1 D 1 0 1 1 0 1 E 1 0 1 1 0 1 F 1 0 1 1 0 1 (2,835) Product 1 0 1 1 0 0 0 1 0 0 1 1

  31. Complete Example M 1 0 1 1 0 1 Q x 1 1 1 1 1 1 A 1 0 1 1 0 1 B 1 0 1 1 0 1 C 1 0 1 1 0 1 S 1 1 0 0 0 0 1 1 1 C 0 0 1 1 1 1 0 0 1 D 1 0 1 1 0 1 E 1 0 1 1 0 1 F 1 0 1 1 0 1 S 1 1 0 0 0 0 1 1 2 C 0 0 1 1 1 1 0 0 2 S 1 1 0 0 0 0 1 1 1 C 0 0 1 1 1 1 0 0 1 S 1 1 0 0 0 0 1 1 2 S 1 1 0 1 0 1 0 0 0 1 1 3 C 0 0 0 0 1 0 1 1 0 0 0 3 C 0 0 1 1 1 1 0 0 2 S 0 1 0 1 1 1 0 1 0 0 1 1 4 C + 0 1 0 1 0 1 0 0 0 0 0 4 Product 1 0 1 1 0 0 0 1 0 0 1 1

  32. Schematic Representation of C.S.A. F E D C B A Level 1 CSA C S C S 2 2 1 1 Level 2 CSA C C S 2 3 3 Level 3 CSA C S 4 4 Final addition + Product 1.7log2k – 1.7 steps, where k is the number of summands

  33. Example Ripple-Carry vs. Carry-Save • Carry-save addition transforms W, X and Y into S and C • Advantages: all bits of S and C are produced in a short fixed amount of time after W, X, and Y are applied • Each row approximately takes one full-adder delay • Carry propagation takes place only in the last row • Carry lookahead adder could be used effectively to add the S and C vectors because all bits of S and C are available in parallel • Consider the addition of many summands • We can group the summands in threes and perform the carry save addition on each of these groups in parallel to generate S and C • Next, group all the S and C vectors into threes and perform carry save addition on them • Continue this process until there are only two vectors remaining • These remaining vectors can be added in a ripple carry or a carry lookahead adder to produce the sum

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer