Current Status

Booster Enclosure Corrector Prototype Installation Filter Installation Dissolved O2 Update 7/20/07 Maurice Ball Fluids Engineering AD/Mechanical Support. Current Status. Filter Delta P Clean, at 1 GPM, 0.3 PSID As of today, Delta P at 6-7 PSID Max Delta P allowed is 25 PSID

wolfe
Télécharger la présentation

Current Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Booster Enclosure Corrector Prototype InstallationFilter InstallationDissolved O2Update7/20/07Maurice BallFluids EngineeringAD/Mechanical Support

  2. Current Status • Filter Delta P Clean, at 1 GPM, 0.3 PSID • As of today, Delta P at 6-7 PSID • Max Delta P allowed is 25 PSID • Differential pressure increase/level off for now • Unusual readings, cannot draw conclusions • Have requested 1 hour access, • record pressures, • inspect replace filter cartridge • Will continue to closely monitor

  3. Full Flow Filter Update • No update • Have found several filter mfrs., obtaining quotes. Still researching • Meeting with FESS planned once filter design is set.