1 / 3

THE RACE HAS BEGUN

THE RACE HAS BEGUN. Central Corridor Bid Opportunity and Plan Holders List -  4th St. Advanced Utility Construction  The due date for bids on this project has been moved back to July 15, 2009 .

Télécharger la présentation

THE RACE HAS BEGUN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THE RACE HAS BEGUN Central Corridor Bid Opportunity and Plan Holders List -  4th St. Advanced Utility Construction  The due date for bids on this project has been moved back to July 15, 2009. The Request for Proposals document can be viewed and downloaded at http://qap.questcdn.com/qap/projects/prj_browse/ipp_prj_browse.html?jobCategoryNo=331630&group=78&provider=663007#cat331630. Input QuestCDN eBidDoc™ Number 911502 on the website’s Project Search page. Contact QuestCDN.com at 952-233­1632 or info@questcdn.com for assistance in downloading and working with the digital documents.

  2. DEVELOP YOUR STRENGHTS • The Work of this Project includes: relocating existing underground public utilities, Xcel Energy electrical conduits and St. Paul District Energy and District Cooling (DE/DC) hot and chilled water lines for a total of six blocks along 4th Street from 200 feet west of Minnesota Street to Broadway Street in St. Paul. Also included in this portion of the CCLRT Project are track and roadway sub-base, adjustments to areaways (below ground building spaces), underground communications, train signal conduits, light rail traction power conduits, pull boxes, above and below-grade traffic signal facilities, cantenary pole foundations, sidewalks, and roadway pavements. • The estimated construction cost is $20,000,000.00.

  3. END THE RACE FIRST • A plan holders list can be found attached to this email. If you have questions please don’t hesitate to ask. Roderic.Southall@metc.state.mn.us

More Related