An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HAWC OBSERVATORY • PRELIMINARY COST ANALYSIS • PRELIMINARY COST SUMMARY

  2. PRE-FAB METAL BUILDING

  3. FLOATING COVER

  4. FLOATING COVER - BASIS • Quote from Layfield • Fabric is 60 mil/5 Ply Hypalon • Cover can be floated at 2m water depth • Curtains attached to the bouyed tension cables • Non-corrosive cables at 3m+/-attached to grade beams • Detailed to provide light-tight construction • Hatch ports for access & maintenance from topside • Rigid enough to support personnel • ROV available to support maintenance and servicing

  5. LINED POND

  6. COST SUMMARY