Pakistan Kidney centre, Abbottabad Pakistan. Introduction

Pakistan Kidney centre, Abbottabad Pakistan. Introduction. By Dr. Khalil Ur Rehman FCPS (Internal Medicine), MRCP, FCPS ( Nephrology). OUR INTRODUCTION. Pakistan Welfare Society (PWS) established in Jeddah KSA, 2006 Registered in 2007 in Islamabad As non profitable & Charitable NGO

xenia
Télécharger la présentation

Pakistan Kidney centre, Abbottabad Pakistan. Introduction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Pakistan Kidney centre, Abbottabad Pakistan.Introduction By Dr. Khalil Ur Rehman FCPS (Internal Medicine), MRCP, FCPS ( Nephrology)

  2. OUR INTRODUCTION • Pakistan Welfare Society (PWS) established in Jeddah KSA, 2006 • Registered in 2007 in Islamabad • As non profitable & Charitable NGO • Registration No:- 1837/2020 dated 10/04/2007

  3. PWS activities in KSA • Fortnightly Free medical Camp under the supervision of Pakistan Consulate, Jeddah since 2006. • Health awareness seminar on various topics. • Educational Activities & others • ( read more )

  4. Activities in Pakistan. • Relieve activities • Earth quake. • Flood. • Eid gift distribution and qurbani meat. • ( read more ) • Now Pakistan Kidney Centre (PKC)

  5. KIDNEY FAILURE. • What's Kidney failure ? • Acute • Mostly reversible • Chronic –silent epidemic • Irreversible • Causes • DM= 40% • HTN, Kidney stone, GN, Drugs, infections, Malignancy

  6. CONSEQUENCE OF CHRONIC KIDNEY FAILURE (CKD) Progression toward end stage renal disease Stage (I  II  III  IV  V) Deterioration of General health ESRD Requiring Dialysis/ Kidney Transplant Not Available Available DEATH within hours to days NEAR NORMAL LIFE with reduced survival

  7. RENAL DATA • Number of patient with CKD in Pakistan = not established • Number of patients on haemodialysis worldwide=20 million ( 2010) • Number of patients with CKD world wide =50 million

  8. KIDNEY FUNCTION • Body Fluid maintenance • Body Electrolytes maintenance • Removal of toxins ( filter) • Provide support for Haemoglobin and Vitamin D • Normally 2 kidneys. • Single kidney • Congenital . • Transplant.

  9. PKC IN ABBOTTABAD • Why ? • Poverty in Pakistan from North to South • Lack of awareness of common disease affecting kidneys due illiteracy. • Poor screening at Primary Health Care level (BHU). • Only 8 dialysis machines available in Public sector in Hazara Division (Ayub Medical Complex, Abbottabad) • No evaluation for Kidney Transplant • Estimated population of catchment area is 10 million

  10. COST OF HAEMODIALYSIS. • In Public sector • Haemodialysis per session Rs 2,000- 3,000 • In Private sector • Haemodialysis per session: Rs 5,000- 6,000 • Ideally 3 session per week.

  11. LOCATION OF DIALYSIS CENTER • Ideally near to a tertiary care health facility • Cardiac issues • ICU Care • Surgery procedures • Access issues • Transplant • Our PKC is close to Ayub Medical Complex

  12. SERVICES OF PKC • Out reach programme • Screening at door step for DM, HTN, CKD • Through periodic medical team visits at BHU levels • Referral/acceptance for treatment at PKC for those with CKD.

  13. Mobile clinic for screening Rs= 50,00,000

  14. TREATMENT AT PKC • Adult patients with Kidney disease • Out patient’s clinic (OPD) • GP’s & specialist (Urologist & Nephrologists) • Dialysis treatment • 10 machines • 2 shifts 8.00 PM to 4.00 PM • If required and feasible a third shift from 5.00 to 8.00 PM

  15. SURGICAL TREATMENT AND PROCEDURES • Treatment for Kidney stones including lithotripsy • Access creation for dialysis patients • Kidney biopsy • Diagnostic facilities • X rays, ECG, ultrasound, laboratory , Blood bank. • Liaison with other hospital AMC, SIUT, PIKD at SHIFA hospital Islamabad & others

  16. Eligibility for treatment. • Outreach screening free for every body. • Centre based treatment will be free for deserving patients. • To off set the running cost, treatment will be available on payment.

  17. STAFFING • Permanent staff • Physicians • 2-3 GP • 1 urologist and 1 nephrologist • Part time Radiologist, Pathologist, Anaesthetist. • Para-medical staff • 5-7 nurses • Technician for X ray, Lab & OT, pharmacist • Administrative staff • 7-8 in number • Visiting- honorary • Nephrologist • Surgeons • Instructors

  18. Site

  19. Site

  20. Site

  21. PKC Site • Acquired 11,084 sq. feet ( 2. 7 kanal) • Purchased and donated to PWS trust worth of 6. 5 million Rupees. • Covered area • Basement= 7,000 sq. feet (option ) • Ground floor= 10,000 sq. feet • First floor = 7,000 sq. feet

  22. DESIGN- BASEMENT

  23. DESIGN- GROUND FLOOR

  24. GF

  25. GF

  26. GF OPD Women waiting

  27. GF

  28. GF

  29. GF

  30. GF

  31. GF

  32. DESIGN- FIRST FLOOR

  33. FF

  34. FF

  35. FF CEO/ Conference room

  36. FF ULTRASOUND AND LITHOTRIPSY ROOM

  37. FF

  38. FF

  39. EQUIPMENT & FINISHING COST • 1 mobile field hospital= 50,00,000.(5 Million) • 2 Ambulance= 20,00,000 (2 Million) • X ray plant=10,00,000 (1 Million) • Laboratory=75,00,000 (7.5 Million) • Ultrasound =50,00,000 (5 Million) • Lithotripsy=1,50,00,000 (15 Million) • Haemodialysis machines=10,00,000 per machine (1 Million) • Over head miscellaneous= 5,00,000 (0.5 Million) • Pharmacy= 30,00,000 ( 3 Million) • Total: 4,90,00,000 (49 Million)

  40. RUNNING COST FOR FIRST MONTH

  41. CONSTRUCTION COST • Basement parking Rs= 14,000,000 (14 million) • Ground Floor Rs=18,500,000 (18.5 million) • First Floor Rs=10.43 Million • Total 42.93 million

  42. TARGET DATES • Foundation stone : - November 2012 • Completion of structure 1 year • Functioning start : March 23, 2014

  43. BOARD OF MANAGEMENT • Dr. Khalil ur Rehman • Dr. Farooq Ahmed Farooqi • Dr. Ayaz Khan • Engr. Khalid Zia • Engr. Mohammad Mansha • Mr. Sharif Zaman • Prof. Dr. Muzamil Hussain • Justice retd Sardar Raza ( expected) • Mr. Ghazi Khan • Mr. Saleem Advocate • Mr. Anas Khalil

  44. FUTURE PLANS • Expansion of PKC • ICU, Kidney transplant • Chain of Kidneys centres in other areas of Pakistan.